Laserfiche WebLink
119 <br />2022 Public Works Work Plan <br />Pathway Improvements <br />v Zucc ra1m1y w1 <br />Existing Pathway <br />Pathway Improvements <br />New Pathways <br />• Twin Lakes Trail Phase 2 <br />• Connect existing Twin Lakes Trail <br />pathway from Terrace into Oasis <br />Park. <br />• Lexington Avenue <br />• Fill gap in network created with <br />Lexington Wood Development <br />• Marion Street Pathway Phase 2 <br />• Connect existing Marion Street <br />pathway form the cul-de-sac to <br />Larpenteur Avenue. <br />• Tamarack (Tentative) <br />• Will utilize remaining Parks <br />Renewal dollars. <br />Resurfacing <br />• Larpenteur Avenue between Gaultier St <br />and Rice St <br />• Central Park <br />