My WebLink
|
Help
|
About
|
Sign Out
Home
2021_1123_PWETCPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2021
>
2021_1123_PWETCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2021 3:37:27 PM
Creation date
11/24/2021 3:36:22 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/23/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
119 <br />2022 Public Works Work Plan <br />Pathway Improvements <br />v Zucc ra1m1y w1 <br />Existing Pathway <br />Pathway Improvements <br />New Pathways <br />• Twin Lakes Trail Phase 2 <br />• Connect existing Twin Lakes Trail <br />pathway from Terrace into Oasis <br />Park. <br />• Lexington Avenue <br />• Fill gap in network created with <br />Lexington Wood Development <br />• Marion Street Pathway Phase 2 <br />• Connect existing Marion Street <br />pathway form the cul-de-sac to <br />Larpenteur Avenue. <br />• Tamarack (Tentative) <br />• Will utilize remaining Parks <br />Renewal dollars. <br />Resurfacing <br />• Larpenteur Avenue between Gaultier St <br />and Rice St <br />• Central Park <br />
The URL can be used to link to this page
Your browser does not support the video tag.