Laserfiche WebLink
2022 Public Works Work Plan <br />=I Storm Sewer System Improvements <br />Miscellaneous Storm Sewer <br />Replacement <br />Miscellaneous upgrades during PMP <br />County Road D Outlet Repair <br />Simpson & C2 Underground <br />Installation of an underground storm water <br />system to reduce flooding at the <br />C2/Simpson intersection. This would be <br />included in the PMP project. <br />Fairview & C Storm Sewer <br />Improvements <br />Upgrades to the outlet of the Fairview & <br />County C storm pond which is also the <br />inlet for the new 84" pipe, formerly RCD 4. <br />The improvements will help reduce long <br />term maintenance and provide some <br />additional storage and treatment <br />capabilities for the basin. <br />Miscellaneous <br />1-00Trm,.raa:3AAr=1 M rr =19% <br />