Laserfiche WebLink
Attachment B <br />Regional Transportation Project Concept Design ReviewJanuary 5, 2022 <br /> Page 6 <br />Multimodal Gaps along Regional Roadways <br />The City’s Pathway Master Plan identified several multimodal gaps within the study area, which <br />included both regional and local connections, which are referred to as Constellation Links. For <br />purposes of this review, the focus was on the infrastructure needed to complete the multimodal gaps <br />along regional facilities. The specific multimodal segments and types are outlined in Table 1 and <br />Figure 3. <br />Table 1Regional Multimodal Infrastructure Gap Need Summary <br />Pathway <br />Segment <br />Master Plan Roadway Limits Type / Location <br />ID * <br />Reference <br />Cleveland Misc. segments from County <br />1A-1C 6 Sidewalk (East Side) <br />Avenue Road D to County Road C <br />County Road D to <br />2 7 Fairview Avenue Trail (East Side) <br />County Road C2 <br />Old Snelling Avenue to <br />3 8 (+ New) Snelling Avenue <br />Trail (West Side) <br />County Road C <br />Snelling Avenue to <br />4 3A Lydia Avenue <br />Sidewalk (South Side) <br />Hamline Avenue <br />Snelling Avenue to <br />5A 25A Hamline Avenue Trail (West Side) <br />County Road C2 <br />Terrace Drive to <br />5B 25B Hamline Avenue Sidewalk (West Side) <br />County Road C <br />Arona Street to <br />6 3A County Road C2 Sidewalk (South Side) <br />Hamline Avenue <br />Twin Lakes Parkway to <br />7 NEW Fairview Avenue <br />Trail (West Side) <br />County Road B2 <br />Oakcrest Avenue to <br />8 28 (Partial) Snelling Avenue <br />Trail (West Side) <br />County Road B2 <br />Commerce Street to <br />9 9 Snelling Avenue Trail (East Side) <br />County Road B <br />16 (Partial) Snelling Avenue <br />10A-10E Rosedale to HarMar Connection See Ped Bridge Detail <br />28 (Partial) (Area) <br />* The segment IDs correspond to the segments shown in Figure 3. <br /> <br /> <br /> <br /> <br />