Attachment B <br />Regional Transportation Project Concept Design ReviewJanuary 5, 2022 <br /> Page 8 <br />PRELIMINARY COST ESTIMATES <br />Preliminary cost estimates were established for the concepts developed as part of this effort. The cost <br />estimates include construction material costs based on the facility type, as well as account for <br />potential pedestrian ramp/driveway apron modifications, utility relocations, tree removal, curb-and- <br />gutter, and retaining walls, where applicable. The costs also include percentage estimates for <br />engineering/design, parcel/right-of-way impacts, drainage, mobilization, and general contingency. <br />Cost shown are in current year dollars. A summary of the preliminary cost estimate for each project is <br />in Table 2. <br />Table 2 Regional Transportation Project Cost Estimate Summary <br />Project <br />Roadway Project Description (ID) Cost Estimate <br />Type <br />Snelling Avenue / <br />Interchange Interchange Construction $30M to $50M <br />CR C <br />Multimodal Cleveland Avenue CR D to CR C Sidewalk (1A-1C) $1.3M <br />Multimodal Fairview Avenue CR D to CR C2 Trail (2) $1.6M <br />Multimodal Snelling Avenue Old Snelling Avenue to CR C Trail (3) $1.0M <br />Multimodal Lydia Avenue Snelling Avenue to Hamline Avenue Sidewalk (4) $0.5M <br />Multimodal Hamline Avenue Snelling Avenue to CR C2 Trail (5A) $1.8M <br />Multimodal Hamline Avenue Terrace Drive to CR C Sidewalk (5B) $0.8M <br />Multimodal County Road C2 Arona Street to Hamline Avenue Sidewalk (6) $0.7M <br />MultimodalFairview AvenueTwin Lakes Parkway to CR B2 Trail (7) $1.9M <br />Multimodal Snelling Avenue Oakcrest Avenue to CR B2 Trail (8) $0.7M <br />Multimodal Snelling Avenue Commerce Street to CR B Trail (9) $0.1M <br />Rosedale to HarMar <br />Bridge / Trail Trail / Bridge Construction (10B, 10E) $11M to $16M <br />Connection <br />TOTAL $51.4M to $76.4M <br />* All costs shown represent current year costs and do not include any inflation. <br /> <br /> <br /> <br />