Laserfiche WebLink
REQUEST FOR CITY COUNCILACTION <br />Agenda Date:May 18, 2020 <br />Agenda Item: 7.e <br />Department ApprovalCity Manager Approval <br />Item Description:Consider approving anamendmentthe Centre Pointe Planned Unit <br />Development (CP-PUD) specific to the Veritas Campus Plan at2815 <br />Cleveland Avenue(PF20-005). <br />1 B ACKGROUND <br />2 The Davis Group seeks to purchase roughly 4.53 acres of underutilized Veritas Campusproperty and <br />3 construct a three story, 55,000 square feet Class “A” medical office building. Such an endeavor <br />4 requires an amendment to the CP-PUD because this request is inconsistent with both the original <br />5(1997) and amended (2001) plan for the Veritas Campus area. In addition to the CP-PUD <br />6 amendment, a minor plat (currently scheduled for Council consideration on June 8) is necessary to <br />7 recombine the existing three lots into two lots(See RPCA as Attachment A). <br />8 S TAFF R EVIEW OF P ROPOSED A MENDMENT <br />9 City staff view the proposal as a net decrease in the overall anticipated traffic occurringon the <br />10 Veritas property as the proposal reduces the total allowed office space by 67,000 square feet <br />11 compared to the 2001 CP-PUD amendment and 6,000 square feet compared to the original CP-PUD. <br />12 It is also worth noting, access to the new office building and the existing Veritas office will be <br />13 shared from the two existing access points on to Centre Pointe Drive. That said, a traffic study was <br />14 completed by SRF Consultingto estimate the trips generated from the new site, which information <br />15 will be used to update the intersection analysis at Centerpointe Drive and Cleveland Avenue to <br />16 determine if the increase in traffic justifies a signal at this location. <br />17 While less dense than the originally anticipated development, the proposed three-story office use <br />18 remains consistent with the uses allowed within the Centre Pointe Business Park and under the PUD. <br />19 Therefore, the Planning Division recommendedapproval of the requested PUD amendment, thereby <br />20 modifying the Veritas master site plan by eliminating two office buildings, four stories in height <br />21 totaling 122,000 square feet and replacing it with a single office building on a separate lot, three <br />22 stories in height and 55,000 square feet in size. <br />23 City Code Section 1023.09 outlines a two-step process for PUD review, including amendments. <br />24 This request seeks to fulfill the Concept Plan review only. Further actions, by both the Planning <br />25 Commission and City Council, will follow in the form of a Final Plan review where an ordinance <br />26 will need to be adopted memorializing theamendment. <br />27 P LANNING C OMMISSION A CTION <br />28 On May 6, 2020, the Roseville Planning Commission held the duly noticed public hearing on the <br />29 CP-PUD Amendment. No citizens were in attendance to ask questions of staff or the Commission. <br />30 Planning Commissionershad noquestions regarding the proposal. The Planning Commission voted <br />PF20-005_CPPUD_VeritasAmendment_RCA_051820 <br />Page 1of 2 <br /> <br />