Laserfiche WebLink
b. Give a complete description of the proposed project and related new construction, <br />including infrastructure needs. If the project is an expansion, include a description of the <br />existing facility. Emphasize 1) construction and operation methods and features that will <br />cause physical manipulation of the environment or will produce wastes; 2) modifications <br />to existing equipment or industrial processes; 3) significant demolition, removal, or <br />remodeling of existing structures; and 4) timing and duration of construction activities. <br />A mixed-use redevelopment is proposed on a 21.43-acre lot north of County Road C and <br />adjacent to Herschel Street in Roseville, Minnesota (see Figure 1 for project location). The <br />site is zoned CMU-4 (community mixed-use), which is a high-density mixed-use <br />designation that is compatible with the proposed residential and commercial <br />development. The project is anticipated to include three residential complexes (one <br />senior and two multifamily residential buildings) and seven commercial buildings. The <br />senior living complex includes a five-story, 277-unit building with rooms ranging from one <br />to three bedrooms. In addition, 294 parking stalls will be provided. Of the required <br />parking spaces, 139 stalls will be surface parking and 155 will be garage parking. The <br />multi-family residential complex includes two four-story buildings with a total of 228 units, <br />with rooms ranging from one to three bedrooms, a clubhouse, screen house, and an <br />outdoor pool. In addition, 397 parking stalls will be provided. Of the required parking <br />spaces, 185 will be surface parking and 212 will be garage parking. The seven <br />commercial buildings include a total of 55,000 square feet (SF) and 325 surface parking <br />stalls. The project will also include green space, stormwater management facilities and <br />associated infrastructure. <br />Vehicular access to the development will be from County Road C onto Herschel Street. <br />A signal is proposed at the Herschel Street/County Road C intersection. A right-in/right- <br />out is proposed along Country Road C to provide an additional access point to the site. <br />Construction is anticipated to begin in May 2020 and will last up to two construction <br />seasons. <br />c. Project magnitude <br />Table 1: Project Magnitude <br />Measure Magnitude <br />Total Project Acreage21.43acres <br />Linear Project LengthN/A <br />Senior Units: 277 <br />Number and Type of Residential Units <br />Family Units: 228 <br />Commercial Building Area (square feet) 55,000 <br />Industrial Building Area (square feet)0 <br />Institutional Building Area (square feet)0 <br />Other Uses –specify (square feet) N/A <br />Senior Apartments: 65 Feet Maximum <br />Structure Height(s) <br />Family Apartments: 50 Feet Maximum <br />d. Explain the project purpose. If the project will be carried out by a governmental unit, <br />explain the need for the project and identify its beneficiaries. <br />Twin Lakes Station 3 March 2020 <br /> <br />