My WebLink
|
Help
|
About
|
Sign Out
Home
2020_0518_CCPacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2020
>
2020_0518_CCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2022 9:35:26 AM
Creation date
1/7/2022 9:34:36 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
5/18/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 8: Current Annual Average Daily Traffic (vehicles per day) <br />Current Annual Average <br />RoadwayDailyTraffic(AADT)vehicles <br />per day (vpd) <br />Fairview Avenue (north of County Road C) 7,000 vpd <br />Fairview Avenue (south of County Road C)13,800 vpd <br />Snelling Avenue (north of County Road C)30,500 vpd <br />Snelling Avenue (south of County Road C) 36,000 vpd <br />County Road C18,000 vpd <br />c. Dust and Odors – Describe sources, characteristics, duration, quantities, and intensity of <br />dust and odors generated during project construction and operation. (Fugitive dust may <br />be discussed under Item 16a). Discuss the effect of dust and odors in the vicinity of the <br />project including nearby sensitive receptors and quality of life. Identify measures that will <br />be taken to minimize or mitigate the effects of dust and odors. <br />The construction and occupancy of the proposed project is not expected to generate <br />objectionable odors. <br />During construction, contractors will follow best management practices to reduce dust <br />emissions. Once occupied, the project is not expected to generate fugitive dust <br />emissions. <br />17. Noise <br />Describe sources, characteristics, duration, quantities, and intensity of noise generated <br />during project construction and operation. Discuss the effect of noise in the vicinity of the <br />project including 1) existing noise levels/sources in the area; 2) nearby sensitive receptors; 3) <br />conformance to state noise standards; and 4) quality of life. Identify measures that will be <br />taken to minimize or mitigate the effects of noise. <br />Existing Noise <br />The project site is located in an urban area surrounded by city and county roads that <br />generate noise typical to those uses. County Road C is the primary existing noise source in <br />the project area. County Road C is exempt from state standards, as described in Minnesota <br />Statutes, section 116.07, subdivision 2a. <br />Construction Noise <br />The Roseville Code of Ordinances regulates the hours of operation for construction <br />equipment and allowable noise levels. Construction of the project would adhere to the <br />requirements identified in the City Code of Roseville, Minnesota, Chapter 405.03, which <br />states, “No person shall engage in or permit construction activities involving the use of any <br />kind of electric, diesel or gas powered machine or other power equipment except between <br />the hours of 7:00 A.M. and 9:00 P.M. on any weekday, or between the hours of 9:00 A.M. and <br />Twin Lakes Station 18 March 2020 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.