Laserfiche WebLink
EXHIBIT A <br />THE PROJECT <br />Improvement A: <br />“Improvement A” shall consist of the following: Remove excess pavement, add curb, add heavy <br />duty drive lanes, and striping within the improvement area. Improvement A also includes the <br />installation of a raingarden adjacent to Hamline Ave. The total project cost for Improvement A <br />materials and installation is estimated to be $215,072.75 <br />Improvement B: <br />“Improvement B” shall consist of the following: Installing an underground stormwater system, <br />storm sewer and connections to City infrastructure, and removing and replacing an existing pipe <br />on the south east property line. The total project cost for Improvement B materials and installation <br />is estimated to be $372,472.33. <br /> <br /> <br />Project Map: <br />A project map follows. <br /> <br />Page 5 of 5 <br /> <br />