My WebLink
|
Help
|
About
|
Sign Out
Home
2020_1109_CCPacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2020
>
2020_1109_CCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 12:34:55 PM
Creation date
1/13/2022 12:34:46 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
11/9/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Luke Sandstrom <br />Date: October 16, 2020 <br />Page:2 <br />Task 2 Final Design Phase <br />Prepare final plans and specifications <br />Design review meetings with City staffas needed <br />Construction cost estimates <br />Bidding services <br />Task 3 Construction Phase <br />Construction administration <br />Construction observation <br />Construction staking(to be completed byBolton & Menk) <br />Coordinating start-up services <br />Record drawings <br />We plan to use a project team similar tothe teams we have assembled for the past lift station projects we <br />have completed for the City of Roseville. Seth Peterson, P.E., will serve as the primary contact for the lift <br />station improvements and Jacob Humburg, P.E. will serve as lead design engineer. Sheldon Sorensen, <br />P.E., from Barr Engineering, will provide the electrical and controls engineering for this project. Mr. <br />Sorensen has worked with Bolton & Menk, Inc., for nearly 20 years on a variety of projects ranging from <br />lift station upgrades to large wastewater treatment facilities. This team has worked together on the past <br />five lift station projects in Roseville. <br />We propose to complete the above design and construction phase services for a total estimated fee of <br />$47,500. The following is a summary of our fees: <br />Design Phase <br />Preliminary Design Phase...............................................$6,000 <br />Survey.............................................................................$5,000 <br />Final Design Phase..........................................................$15,000 <br />SubtotalNot-to-Exceed Fixed Fee................................$26,000 <br />Construction Phase <br />Construction Administration...........................................$8,000 <br />Construction Observation ...............................................$12,000 <br />Record Drawings............................................................$1,500 <br />SubtotalEstimated Fee.................................................$21,500 <br />Total Estimated Fee......................................................$47,500 <br />Because the engineer has no direct control over the scheduling or operations of the project contractor, <br />construction phase services described in this proposal are estimated based on similar projects and are <br />proposed to be provided on an hourly basis at the rates noted. <br />.Ȁ͐0±®¯®² «²͐2®²¤µ¨««¤͐,®¦ , ª¤ ,¨¥³ 3³ ³¨®͐,®¦ , ª¤ ,3 3¢®¯¤ £ &¤¤ «¤³³¤±ȁ£®¢· <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.