Laserfiche WebLink
Attachment B <br />City of Roseville <br />2021 Propsed Fee Schedule <br />Electrical Permit Fees: Community Development <br />City20202021 <br />Electrical Permit Fee DescriptionCodeAmountAmountComments <br />Minimum feen/a$ 45.00$ 45.00No refunds available <br />Services, changes for services: <br />0 to 300 ampn/a$ 55.00$ 55.00 <br />400 ampn/a 71.00 71.00 <br />500 ampn/a 87.00 87.00 <br />600 ampn/a103.00103.00 <br />800 ampn/a135.00135.00 <br />1,000 ampn/a167.00167.00 <br />1,100 ampn/a183.00183.00 <br />1,200 ampn/a199.00199.00 <br />Add $16 for each additional 100 amps <br />Circuits, changes for services: <br />0 to 100 ampn/a$ 9.00$ 9.00 <br />101 to 200 ampn/a 15.00 15.00 <br />201 to 300 ampn/a 21.00 21.00 <br />301 to 400 ampn/a 27.00 27.00 <br />401 to 500 ampn/a 33.00 33.00 <br />501 to 600 ampn/a 39.00 39.00 <br />601 to 700 ampn/a 45.00 45.00 <br />Add $6 for each additional 100 amps <br />Solar Fees: <br />0kw-5kwn/a 90.00 90.00 <br />5.1kw-10kwn/a150.00150.00 <br />10.1kw-20kw225.00225.00 <br />20.1kw-30kwn/a300.00300.00 <br />30.1kw-49.9kwn/a375.00375.00 <br />50kw-and largern/a400.00400.00 <br />Add $25 for each additional 10kwn/a25.00/10kw25.00/10kw <br />Residential panel replacementn/a$ 110.00$ 110.00 <br />Residential sub paneln/a 45.00 45.00 <br />Minimum fee: <br />Inspection onlyn/a 45.00 45.00Plus $1 State surcharge <br />Rough-in & finaln/a 90.00 90.00Plus $1 State surcharge <br />Single-family dwelling/townhouse < 200 amps *n/a190.00190.00Plus $1 State surcharge <br />Apartment buildings (per unit)n/a 80.00 80.00Excludes cover svc, unit feeder <br /> & house panels <br />Swimming pool (up to two inspections)n/a 90.00 90.00 <br />Additions, remodels, basement additionsn/a 90.00 90.00Up to 10 circuits & 2 inspection <br />Accessory structure: <br />Paneln/a 55.00 55.00 <br />Per circuitn/a9.009.00 <br />Inspectionn/a 90.00 90.00 <br />Traffic signals (per standard)n/a8.008.00 <br />Street & parking lot lights (per standard)n/a5.005.00 <br />Transformers & Generators: <br />Up to 10 KVAn/a5.005.00 <br />11-74 KVAn/a 40.00 40.00 <br />75-299 KVAn/a 60.00 60.00 <br />300+ KVAn/a165.00165.00 <br />Retro-fit lighting (per fixture)n/a0.850.85 <br />Sign transformer (each)n/a9.009.00 <br />Low voltage fire alarm, low voltage heating and air con/a0.850.85 <br />Re-inspection fee (in addition to others)n/a 45.00 45.00 <br />Hourly rate for carnivals n/a 90.00 90.00 <br />Comments: <br />*Fee covers a maximum of three inspections <br />Permit fee is doubled if work is started before permit is issued <br />** <br />*** Minimum fee electrical permits are not refundable <br />1 <br /> <br />