Laserfiche WebLink
Attachment B <br /> -plus $15.40 for each add'l $1,000 <br /> -value or fraction thereof <br />$50,001 - $100,000 valuation 961.00 961.00For the first $50,000 value; <br /> -plus $10.70 for each add'l $1,000 <br /> -value or fraction thereof <br />$101,001 - $500,000 valuation 1,496.00 1,496.00For the first $100,000 value; <br /> -plus $8.60 for each add'l $1,000 <br /> -value or fraction thereof <br />$500,001 - $1,000,000 valuation 4,936.00 4,936.00For the first $500,000 value; <br /> -plus $7.10 for each add'l $1,000 <br /> -value or fraction thereof <br />$1,000,000 + valuation 8,486.00 8,486.00For the first $1,000,000 value; <br /> -plus $5.70 for each add'l $1,000 <br /> -value or fraction thereof <br />Erosion control inspection permit:0 <br />Less than 1 acre1017 625.00 1,000.00 <br />1 to 5 acres1017 900.00 1,500.00 <br />More than 5 acres1017 1,400.00 2,000.00 <br />Shoreland district < 5,000 sq. ft.1017 300.00 300.00 <br />Residential remodel (less than 1/4 acre)1017 300.00 300.00 <br />Permit renewal (residential remodel)1017 150.00 150.00 <br />Erosion control permit renewal: - <br />Less than 1 acre1017$ 220.00$ 500.00 <br />1 to 5 acres1017 320.00 750.00 <br />More than 5 acres1017 480.00 1,000.00 <br />Grading Permit Fee - Engineering: - <br />50 cubic yards or less$ 50.00$ 50.00 <br />51 - 250 cubic yards100.00 100.00 <br />251 - 1,000 cubic yards 200.00 200.00 <br />1,001 - 10,000 cubic yards 350.00 350.00 <br />10,000 + cubic yards 650.00 650.00 <br />Stormwater drainage fees803n/an/aEstablished separately <br />Stormwater impact fee (per cubic foot)1017 30.00 30.00 <br />Stormwater residential permit: - <br />Initialn/a 250.00 250.00 <br />Renewal (5 year term)n/a 100.00 100.00 <br />Stormwater Permit Review - <br />Less than 1 acre803 35.00 35.00 <br />1-5 acres803 75.00 75.00 <br />More than 5 acres803 125.00 125.00 <br />Non-compliance finen/a 100.00 100.00 <br />House Moving Permit Fee: - <br />Over private property only$ 95.00$ 95.00 <br />Over public streets 137.00 137.00 <br />Investigation fee (hourly) 70.00 70.00 <br />Manufactured Home Permit Fee (new installation) 275.00 275.00 <br />Mechanical Permit Fee - Residential: - <br />Air conditioning: replacement 61.00 61.00 <br />Warm air furnace: replacement 61.00 61.00 <br />Hot water boilers: replacement 61.00 61.00 <br />Unit heaters 61.00 61.00 <br />Swimming pool heaters 61.00 61.00 <br />New construction, misc. work & gas piping- $61.00 minimum fee <br />Minimum fee 61.00 61.00 <br />Gas fireplace 61.00 61.00 <br />In floor heat 85.00 85.00 <br />Mechanical Permit Fee - Commercial (All)- Plus $61.00 <br />9 <br /> <br />