My WebLink
|
Help
|
About
|
Sign Out
Home
2021_0104_CCPacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2021
>
2021_0104_CCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 1:27:33 PM
Creation date
1/13/2022 1:27:17 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
1/4/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2021 Capital Improvement Plan <br /> Project/Initiative Summary <br />Department/Division: Public Works / Engineering <br />Project/Initiative Title: Equipment Replacement <br />Total Estimated Cost: $129,000 <br />Funding Source: PW Vehicle and Equipment Fund (Property Taxes) <br />Annual Operating Budget Impact: No additional impact <br /> <br /> <br /> <br />Project/Initiative Description: <br />Continuing with the practice of replacing equipment in a timely manner to reduce maintenance costs and <br />down time and to maximize the trade or resale value of the asset, Public Works is proposing to replace the <br />following: <br /> 2015 Pavement Router ($16,000) <br /> Salt Truck Calibration Scale ($7,000) <br /> Vehicle Analyzer Software update (required every two years) ($1,000) <br />Utility Locator ($5,000) <br /> Central Garage Column Lifts ($100,000) <br />Location: <br />Not applicable. <br />16 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.