Laserfiche WebLink
2021 Capital Improvement Plan <br /> Project/Initiative Summary <br />Department/Division: Public Works / Engineering <br />Project/Initiative Title: Equipment Replacement <br />Total Estimated Cost: $129,000 <br />Funding Source: PW Vehicle and Equipment Fund (Property Taxes) <br />Annual Operating Budget Impact: No additional impact <br /> <br /> <br /> <br />Project/Initiative Description: <br />Continuing with the practice of replacing equipment in a timely manner to reduce maintenance costs and <br />down time and to maximize the trade or resale value of the asset, Public Works is proposing to replace the <br />following: <br /> 2015 Pavement Router ($16,000) <br /> Salt Truck Calibration Scale ($7,000) <br /> Vehicle Analyzer Software update (required every two years) ($1,000) <br />Utility Locator ($5,000) <br /> Central Garage Column Lifts ($100,000) <br />Location: <br />Not applicable. <br />16 <br /> <br />