My WebLink
|
Help
|
About
|
Sign Out
Home
2021_0104_CCPacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2021
>
2021_0104_CCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 1:27:33 PM
Creation date
1/13/2022 1:27:17 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
1/4/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />9 <br />21 <br />| <br /> <br />, 201 <br />Page <br />August 12 <br />– over 50,000 <br />Approved <br /> <br />water model <br /> <br />Timeline <br /> <br /> <br />Refine condition rating criteria for ponds, pipes and structures Start intensive inspection program using new asset management program and mobile devices27 ponds have been surveyed since <br /> 2018 recording current condition and amount of sediment in pondsRecord condition ratings and refine CIP based on priority infrastructure needs linear feet of pipe televised since 2018 <br /> allowing staff to input condition ratings and review CIP for necessary repairsPropose budget for the phased development of a City wide stormEnhance as built data within GIS database <br /> to support city wide model <br />and Beyond <br /> <br /> Quarter, 2019 Quarter, 2019 <br />Quarter, 2019Quarter, 2019 <br /> Quarter, 2019 Quarter, 2019 <br /> Quarter, 2019 Quarter, 2019 <br /> <br /> <br />stndrdthstndrdth <br /> funded in order to guarantee that storm water <br />12342020 1234 <br /> <br /> <br /> <br />2020 <br />sion <br />9- <br />201 <br /> <br /> <br />Roseville City Priority Plan <br /> <br />PWET CommissionPWET Commission <br />Public WorksPublic Works <br /> <br />Responsible Staff/Commis <br /> Consultants, Watersheds Consultants <br />Staff Lead: Supporting Staff: Commissions:Others:Staff Lead:Supporting Staff:Commissions:Others: <br />Improve Storm Water Facilities Ensuring storm water facilities are properly maintained andquality is maintained and flooding issues are mitigated <br /> <br /> <br /> <br /> Public Improvements <br /> <br />A <br />Goals/Focus Area <br />Attachment Strategic Priority: Strategic Initiative:Desired Outcomes: <br />Develop Condition Rating Criteria for ponds, storm water pipes and structures and start intensive inspection program Develop a City wide storm water model to identify localized flooding <br /> locations and system deficiencies for large rain events <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.