Laserfiche WebLink
3 <br />boulevard on the south side of the street , stormwater basins, and other open areas will accommodate  <br />some snow storage. The HOA may be required to haul snow “off‐site” if needed due to excessive snow  <br />amounts.   <br />F.) Storm Water Run‐off.  Storm water systems are extensive, and designed to meet the City and Capital  <br />Region Watershed requirements. The storm water basins are designed to retain, infiltrate, and treat  <br />water before it leaves the site.    <br />G.) Pedestrian Trail. In conjunction with the city’s desire to offer trail to access the neighborhood from the  <br />south of the site heading northerly to McCarron’s Lake Park, the plat shows a proposed trail. General  <br />comment was that this was a needed improvement.    <br />   <br />Your consideration is most appreciated.   <br />   <br />Thank you.  <br />   <br />   <br />   <br />   <br />   <br />   <br />   <br /> <br /> <br /> <br />RCA Attachment D <br />Page 46 of 51