My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 02222021
Roseville
>
City Council
>
City Council Meeting Packets
>
2020
>
CCP 02222021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 3:01:15 PM
Creation date
1/13/2022 2:59:55 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
2/22/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
778
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />10 <br />of <br />9 <br />Page <br />Attachment <br />RCA <br /> CITIES OF MAPLEWOOD/ROSEVILLE/SAINT PAUL <br />Marion Greenway Enhance the connection from McCarrons Lake to the Washington Technology Magnet School. This connection will require improved (above standard) crossings at Wheelock Parkway <br /> and at Larpenteur Avenue. Big Idea: Create a Marion Street greenway connection <br />Enhance streetscape and lighting Enhance the public realm streetscape with pedestrian amenities and enhanced lighting. The enhanced streetscaping will occur primarily along Rice Street <br /> and Larpenteur Avenue. Secondary streetscape treat-ments may occur along Marion Street and Wheelock Parkway.Big Idea: Enhance the streetscape along primary routes <br />n <br />la <br />BIG IDEAS Connect the Lake to the Gateway Strengthen the connection between McCarrons Lake and the heart of the commercial district at Rice Street and Larpenteur Avenue.Big Idea: Connect <br /> the Lake to Gateway <br />Corridor Plan RecommendationsCorridor P <br />525 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.