Laserfiche WebLink
Bid Tabulation <br />Project Name: Guidant John Rose MN Oval - Ice System Improvements - Bid Package 1 - Refrigeration <br />Location: Roseville, Minnesota <br />Date and Time: Thursday, January 27, 2022 at 2PM local time <br />Bidder Information <br />Base Bids Unit <br />Lump Sum Bid Price for Base Bid LS <br />TOTAL BASE BIDS <br />Alternates Unit <br />Alt 1 - Replace all steel brine piping, valves, and <br />accessories Add <br />Alt 2 - Delete replacement of existing brine pumps Deduct <br />Alt 3 - Furnish and install new control system Add <br />Alt 4 - Delete installation of water preheating system Deduct <br />Alt 5 - Furnish and install radiant heating system in <br />new ADA ramp Add <br />Alt 6 - Furnish & install preformed elastic joint seal <br />material in place of pre-compressed foam hybrid <br />material <br />Deduct <br />Alt 7 - Delete base bid expansion joint material in <br />center islands Deduct <br />Alt 8 - Delete alt bid 6 expansion joint material around <br />new concrete slabs in center of oval Deduct <br />Total <br />Total Total Total Total Total Total Total <br />Bidder No.7 Bidder No.8 <br />Commercial <br />Refrigeration <br />System <br />YES / NO YES / NO <br />YES / NO YES / NO <br />1, 2 and 3 1, 2 and 3 <br />YES / NO YES / NO <br />$0.00 $0.00 <br />Total Total <br />YES / NO <br />1, 2 and 3 <br />$0.00 <br />Total <br />YES / NO <br />B32 File No.: 900-21-427 <br />Bidder No.1 Bidder No.2 Bidder No.3 Bidder No.4 Bidder No.6 <br />Rink-Tec <br />International <br />YES / NO <br />Bidder No.5 <br />Bidder Name Corval Group Total Mechanical LS Black Constructors Armor Mechanical, <br />LLC <br />Gartner Refrigeration <br />Sales <br />Addenda Acknowledged 1, 2 and 3 <br />YES / NO <br />1, 2 and 3 1, 2 and 3 1, 2 and 3 <br />YES / NO <br />Prequalification Info (Div 13)YES / NO YES / NO YES / NO YES / NO YES / NO <br />Bid Security (5%)YES / NO YES / NO YES / NO YES / NO <br />Mandatory Pre-Bid Attendance YES / NO <br />1, 2 and 3 <br />Total <br />$1,793,875.00 $1,845,000.00 <br />YES / NO YES / NO YES / NO <br />Total Total Total Total Total <br />$1,793,875.00 $1,845,000.00 $0.00 $0.00 $0.00 <br />($42,552.00)($31,000.00) <br />$266,916.00 $261,000.00 <br />($30,522.00)($34,250.00) <br />$103,607.00 $76,450.00 <br />($8,890.00)($24,000.00) <br />$18,130.00 $21,000.00 <br />$1,942,450.00 <br />($11,600.00)($2,000.00) <br />($50,130.00)($12,000.00) <br />$1,915,612.00 <br />Attachment A