Laserfiche WebLink
Bid Package 1 - Refrigeration <br />Guidant John Rose MN Oval – Ice System Improvements <br />Roseville, Minnesota Agreement <br />Project No. 900-21-427 0052131 <br />SECTION 005213 <br />AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR <br />FOR CONSTRUCTION CONTRACT (STIPULATED PRICE) <br />THIS AGREEMENT is by and <br />between City of Roseville, Minnesota (“Owner”) and <br />(“Contractor”). <br />Owner and Contractor hereby agree as follows: <br />ARTICLE 1 – WORK <br />1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. <br />The Work is generally described as follows: Bid Package 1 – Refrigeration. <br />Improvements to the existing refrigeration system including replacement of specific <br />refrigeration equipment, controls and electrical, HVAC improvements in refrigeration <br />room and related work. <br />ARTICLE 2 – THE PROJECT <br />2.01 The Project, of which the Work under the Contract Documents is a part, is generally <br />described as follows: _Ice System Improvements Bid Package 1 - Refrigeration__ <br />ARTICLE 3 – ENGINEER <br />3.01 The Project has been designed by _B32 Engineering Group, Inc.____________. <br />3.02 The Owner has retained __B32 Engineering Group, Inc.__ (“Engineer”) to act as <br />Owner’s representative, assume all duties and responsibilities, and have the rights and <br />authority assigned to Engineer in the Contract Documents in connection with the <br />completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 – CONTRACT TIMES <br />4.01 Time of the Essence <br />A.All time limits for Milestones, if any, Substantial Completion, and completion and <br />readiness for final payment as stated in the Contract Documents are of the essence <br />of the Contract. <br />4.02 Contract Times: Dates <br />A.The Work will be substantially completed on or before _October 15, 2022, and <br />completed and ready for final payment in accordance with Paragraph 15.06 of the <br />General Conditions on or before _November 1, 2022____. <br />B.Parts of the Work shall be substantially completed on or before the following <br />Milestone(s): <br />1.All site work on the east half of the site/oval outside the refrigeration building: <br />June 17, 2022. <br />Attachment D