Laserfiche WebLink
Bid Package 1 - Refrigeration <br />Guidant John Rose MN Oval – Ice System Improvements <br />Roseville, Minnesota Agreement <br />Project No. 900-21-427 0052134 <br />ARTICLE 7 – INTEREST <br />7.01 All amounts not paid when due shall bear interest at the rate of _1.0_ percent per <br />annum. <br />ARTICLE 8 – CONTRACTOR’S REPRESENTATIONS <br />8.01 In order to induce Owner to enter into this Contract, Contractor makes the following <br />representations: <br />A.Contractor has examined and carefully studied the Contract Documents, and any <br />data and reference items identified in the Contract Documents. <br />B.Contractor has visited the Site, conducted a thorough, alert visual examination of <br />the Site and adjacent areas, and become familiar with and is satisfied as to the <br />general, local, and Site conditions that may affect cost, progress, and performance <br />of the Work. <br />C.Contractor is familiar with and is satisfied as to all Laws and Regulations that may <br />affect cost, progress, and performance of the Work. <br />D.Contractor has carefully studied all: (1) reports of explorations and tests of <br />subsurface conditions at or adjacent to the Site and all drawings of physical <br />conditions relating to existing surface or subsurface structures at the Site that have <br />been identified in the Supplementary Conditions, especially with respect to <br />Technical Data in such reports and drawings, and (2) reports and drawings relating <br />to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have <br />been identified in the Supplementary Conditions, especially with respect to <br />Technical Data in such reports and drawings. <br />E.Contractor has considered the information known to Contractor itself; information <br />commonly known to contractors doing business in the locality of the Site; <br />information and observations obtained from visits to the Site; the Contract <br />Documents; and the Site-related reports and drawings identified in the Contract <br />Documents, with respect to the effect of such information, observations, and <br />documents on (1) the cost, progress, and performance of the Work; (2) the means, <br />methods, techniques, sequences, and procedures of construction to be employed <br />by Contractor; and (3) Contractor’s safety precautions and programs. <br />F.Based on the information and observations referred to in the preceding paragraph, <br />Contractor agrees that no further examinations, investigations, explorations, tests, <br />studies, or data are necessary for the performance of the Work at the Contract <br />Price, within the Contract Times, and in accordance with the other terms and <br />conditions of the Contract. <br />G.Contractor is aware of the general nature of work to be performed by Owner and <br />others at the Site that relates to the Work as indicated in the Contract Documents. <br />H.Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or <br />discrepancies that Contractor has discovered in the Contract Documents, and the <br />written resolution thereof by Engineer is acceptable to Contractor. <br />I.The Contract Documents are generally sufficient to indicate and convey <br />understanding of all terms and conditions for performance and furnishing of the <br />Work. <br />Attachment D