My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 02142022
Roseville
>
City Council
>
City Council Meeting Packets
>
2022
>
CCP 02142022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 10:34:01 AM
Creation date
2/10/2022 10:32:44 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bids Received <br />•Pre-bid estimate on this package was <br />$1,970,502 <br />•2 Bids Received <br />•1 Bid did not meet the Quality Assurance <br />requirement for a qualifying bid <br />•Remaining bid was from Total Mechanical Inc. <br />•Base Bid: $1,845,000 <br />•Recommended Alternates: $97,450 <br />•TOTAL Recommended for Acceptance: <br />$1,942,450 <br />Recommended Alternates <br />•Alternate #3: Add ice rink control system for remote <br />monitoring and greater control. Proposed cost of <br />$76,450 <br />•Alternate #5: Add radiant heating to new ADA ramp <br />(included in Bid Package 2) for snow melting. Proposed <br />cost $21,000. <br />Bid Package 1: Refrigeration <br />Award OVAL Bid Packages Attachment F
The URL can be used to link to this page
Your browser does not support the video tag.