My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 02142022
Roseville
>
City Council
>
City Council Meeting Packets
>
2022
>
CCP 02142022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 10:34:01 AM
Creation date
2/10/2022 10:32:44 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anticipated Project Budget <br />Award OVAL Bid Packages <br />Pre-Bid Engineer’s <br />Cost Estimates <br />Bid Amounts with <br />Recommended <br />Alternates <br />Package 1: Refrigeration $1,970,502 $1,942,450 <br />Package 2: Site $920,330 $1,037,950 <br />Package 3: Padding System $326,600 $326,600* <br />Engineering (Awarded June 21, 2021)$273,750 $273,750 <br />Other Expenses (Survey work & ADA Engineering)$15,900 $15,900 <br />Contingency on Remaining Projects $392,918 $303,350 <br />TOTAL $3,900,000 $3,900,000 <br />* Package 3 is the Engineer’s estimate <br />Attachment F
The URL can be used to link to this page
Your browser does not support the video tag.