Laserfiche WebLink
REQUEST FOR COUNCIL ACTION <br />Date: March 7, 2022 <br />Item No.: 10.d <br />Department Approval City Manager Approval <br />Item Description: Approve Resolution Awarding Contract for Lexington Watermain Project <br />1 B ACKGROUND <br />2 The City has documented a number of watermain breaks on the watermain running along Lexington <br />3 Avenue from County Road C to Woodhill Drive. These breaks are difficult to repair due to the <br />4 County Road impacts and adjacent utilities. <br />5 The City developed a project that includes replacing the existing watermain by pipe bursting the <br />6 existing pipe. This project was sent out for bids, and bids were opened on March 1, 2022. <br />7 Based on past practice and state law, the City Council has awarded the contract to the lowest <br />8 responsible bidder. For the Lexington Watermain Project, the apparent low bid is $543,996.14. The <br />9 following is a summary of the bids received for this project: <br />Contractor Bid <br />$543,996.14 <br />SGP Contracting, Inc. <br />Northdale Construction, Inc. $587,973.62 <br />$590,309.00 <br />New Look Contracting, Inc. <br />$653,989.60 <br />Pember Companies, Inc. <br />$578,110.00 <br />Engineer’s Estimate <br />10 P OLICY O BJECTIVE <br />11 It is City policy to keep utility infrastructure in good operating condition and to keep systems <br />12 operating in a safe condition. <br />13 B UDGET I MPLICATIONS <br />14 Staff received four bids for this project. The low bid submitted by SGP Contracting, Inc., in the <br />15 amount of $543,996.14, is 6% lower than the engineer’s construction estimate of $578,110.00. The <br />16 2022 amended capital improvement budget included $800,000 for this project. <br />17 This project will be funded using approximately $543,996.14 from the Water Utility fund. <br />18 This project is proposed to be completed by June 18, 2022 prior to Rosefest activities. <br />19 S TAFF R ECOMMENDATION <br />20 Staff recommends approval of a resolution awarding a contract for the Lexington Watermain Project <br />21 in the amount of $543,996.14 to SGP Contracting, Inc. <br />Page 1 of 2 <br /> <br />