Laserfiche WebLink
163 e. Drive-through canopies and other structures, where present, shall be constructed from the <br />164 same materials as the primary building and with a similar level of architectural quality and <br />165 detailing. TheTake 5 Car Wash proposal includes a number of canopies, however not all are <br />166 affiliated with the drive-through. One canopy is designed as a component of the payment <br />167 kiosk. This freestanding canopy covers three drive-through wash lanes and is of a modern <br />168 design. The secondcanopy type is providedon the building, bothat the entrance and exit of <br />169 the wash bay. These are integrated into the building in a cantilever design similar to the <br />170 design of the kiosk canopy. The last canopy type are those that cover the 15 vehicle vacuum <br />171 stalls. There are 12 vacuum stalls on the west side of the property and 3 on the north, all of <br />172 which are accommodated with the same canopy designand materials similar to that of the <br />173 payment kiosk canopy. These proposed canopies aredeemed by staff to satisfy this <br />174 requirement, however Planning Division staff will confirm Code compliance during the <br />175 building permit review and approvalprocess. <br />176 f. A 10-foot buffer area with screen planting and/or an opaque wall or fence between 6 and 8 <br />177 feet in height shall be required between the drive-through lane and any property line <br />178 adjoining a public street or residentially zoned property or property in residential use and <br />179 approved by the Community Development Department (Ord. 1443, 6-17-2013). The <br />180 Community Development Department has determined this drive-through lane requires screen <br />181 fencing at both of the curves of the exit lane from the wash building to properly screen <br />182 headlights from County Road C. The revised site plan includes fence screens in these <br />183 general areas, however, the Planning Division will work with the applicant on the exact <br />184 location, as well as landscaping to augment the fencing prior to the building permit being <br />185 issued. <br />186 P LANNING D IVISION R ECOMMENDATION <br />187 The Planning Division recommends approval of the CU to allow a drive-through for Take 5 Car <br />188 Washat 1701County Road C, based on the submitted site and development plans, subject to the <br />189 following conditions: <br />190 a. The site, building placement, and drive-through lane shall be constructed substantially <br />191 consistent with the plans submitted February 18, 2022, and provided as a component of the <br />192 report packet, unless otherwise revised to comply with Zoning Code standards. <br />193 b. The applicant and their landscape consultant shall work with Planning Division staff on a full <br />194 site landscaping and specifically an appropriate screen for the southern curves of the drive- <br />195 through lane to minimize or eliminate vehicle headlight impacts to County Road C. <br />196 S UGGESTED P LANNING C OMMISSION A CTION <br />197 By motion, recommend approval of a C ONDITIONAL USE for 1701 County Road Callowing a <br />198 drive-through on the subject property based on the comments, findings, and two conditions <br />199 stated in this report. <br />PF21-020_RPCA_Take5CW_CU_030222 <br />Page 5 of 6 <br /> <br />