Laserfiche WebLink
Attachment A <br /> <br /> <br />5. Project Costs <br /> <br />5.1. Except as provided herein, the City and the County will participate in the costs of <br />construction in accordance with the Ramsey County Cost Participation Policy and <br />approved in the 2022 – 2026 Ramsey County Transportation Improvement Plan. If <br />there is a conflict between the Cost Participation Policy and this Agreement, this <br />Agreement will prevail. <br /> <br />5.2. A list of the construction pay items and associated unit costs to be shared between <br />the City and County is attached as Exhibit B - Engineer’s Estimate. Quantities and <br />unit prices in Exhibit B are estimates. Actual costs shall be based on the contract <br />unit prices and the quantities constructed. <br /> <br />5.3. The County will share 50% of the cost of pay items associated with the trail <br />construction as shown in Exhibit B. <br /> <br />5.4. The County will not share in the cost of water main installation pay items, other <br />than existing utility adjustments. <br /> <br />5.5. Design Engineering Costs <br /> <br />5.5.1. The City will design the Project plans. The County shall pay the City a <br />design engineering fee equal to 12% of the County’s share for the pay items <br />associated with the trail construction as shown in Exhibit B. <br /> <br />5.5.2. Design engineering fees shall be calculated based on the quantities and unit <br />prices at the time of contract award. <br /> <br />5.6. Right of Way Acquisition Costs <br /> <br />5.6.1. No right-of-way is being acquired as part of the Project. <br /> <br />5.7. Construction Engineering Costs <br /> <br />5.7.1. The County shall pay the City a construction engineering fee equal to 12% <br />of the County’s share for the pay items associated with the trail construction <br />as shown in Exhibit B. <br /> <br />5.7.2. Construction engineering and administration fees shall be calculated based <br />on the final contract quantities and unit prices. <br /> <br />6. Payment Schedule <br /> <br />6.1. Design engineering will be invoiced at the time of contract award. <br /> <br /> Page 3 of 7 <br /> <br /> <br />