Laserfiche WebLink
Attachment A <br />4.3 Roseville will be the contracting party and will use ordinary and prudent efforts to require <br />that the Project is constructed in compliance with approved plans and specifications and <br />completed with reasonable promptness. <br />4.4 Roseville will notify Xcel of any change order which increases the cost of any individual <br />construction contract for the Project by more than $5,000 of the original amount thereof or <br />which materially changes the scope of the Project. Roseville shall obtain the written <br />authorization of Xcel prior to approving such a change order. However, prior written <br />authorization is not necessary if the change order presents imminent health/safety issues <br />making prior authorization impractical. In such cases, the change order shall be seasonably <br />presented to Xcel for ratification. <br />5. PAYMENT OF COSTS OF PROJECT <br />5.1 The cost of the Project will be categorized based on ownership of the infrastructure and <br />charged to the Parties accordingly. Costs will include, but not be limited to, the services <br />identified in Article 6 hereof, all costs related to obtaining all necessary permits and <br />approvals for the Project, costs incurred in agreements, and any and all other costs <br />associated with the Project. <br />5.2 All invoices or requests for payment will be approved and paid by Roseville. Within 10 <br />days of the end of each calendar month, Roseville shall provide a statement to Xcel <br />showing the prior month's activity, the invoices received, the full costs of services provided <br />by Roseville staff, and the amount Xcel owes to Roseville for the Project and for items <br />outside of the Project. Within 30 days of the receipt of that statement, Xcel shall pay that <br />amount to Roseville or provide in writing a list and explanation of any amounts it disputes <br />and pay the undisputed amount. Any disputes regarding payment shall be resolved through <br />the dispute resolution process contained in Article 7 hereof. <br />5.3 If this Agreement is terminated under Section 8 hereof, both Parties shall nevertheless be <br />liable for the payment of their cost share which is incurred up to the date of termination of <br />this Agreement, or as a result of termination of this Agreement. <br /> <br />6. SERVICES TO BE PROVIDED BY ROSEVLLLE AND XCEL <br />6.1 Roseville will provide qualified engineering employees to perform street and utility design <br />and related technical services to the City Water Project. These services include: <br /> Complete design; <br /> Acquire required permits and approvals; <br />Prepare plans and specifications; <br /> Manage contracts made for completion of the Project and for items outside the Project; <br /> Supervise construction, including inspection of the water work including; <br />o Removal of (2) full concrete panels from Dellwood to just west of Lexington <br />o Replacement of waterline and necessary testing and service work <br />o Backfill ditch up to bottom of binder course with select granular material <br />o Curb replacement as needed <br />Temporary mailbox handling <br />o Conduct construction surveying; <br />o Prepare as- built drawings; <br />o Design utilities, as required; <br /> <br />