Laserfiche WebLink
County Road B Reconstruction <br />Existing Conditions <br />Existing Conditions <br />• Two-lane road <br />• Shoulders, variable width <br />• Parking <br />• Pathway, 8-foot bituminous <br />• Utilities <br />• Historical Traffic <br />• 2005 — 2,650 ADT (before TH 280 closure) <br />• 2009 — 1,300 ADT <br />• 2021 — 1,365 ADT (near Cleveland) <br />• 85t" Percentile Speed: 36 mph <br />Volume <br />(weekday ADT) <br />Average <br />Median <br />85% <br />95% <br />2093 CR B <br />r 1365.5 <br />30.7 <br />31.1751 <br />34.8 <br />37.45 <br />2215 CR B <br />865.51 <br />32.725 <br />32.8751 <br />38.5 <br />41.9 <br />2336 CR B <br />403.51 <br />27.825 <br />27. jj <br />34.475 <br />39.2 <br />Averagesi <br />878.21 <br />30.41 <br />30.91 <br />35.9 <br />39.5 <br />