My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 06062022
Roseville
>
City Council
>
City Council Meeting Packets
>
2022
>
CCP 06062022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2022 12:05:02 PM
Creation date
8/11/2022 12:04:51 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
6/6/2022
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />1 Agreement by the Developer shall be grounds for denial of building permits, including lots sold to <br />2 third parties. <br />3 Q. Land Occupancy. No certificate of occupancy shall be issued until: <br />4 1.All water and sewer improvements are installedand pass testingper City specifications. <br />5 2. The lot has access through roadways with a minimum of one lift of pavement installed. <br />6 R.Construction Management. The Developer and its contractors and subcontractors shall minimize <br />7 impacts from construction on the surrounding neighborhood as follows: <br />8 1.Definition of Construction Area. The limits of the Project Area shall be defined with <br />9 heavy-duty erosion control fencing approved by the City Engineer. Any grading, <br />10 construction or other work outside this area requires approval by the City Engineer and <br />11 the affected property owner. <br />12 2. Parking and Storage of Materials. No fill, excavating material or construction materials <br />13 shall be stored in the public right-of-way. <br />14 3. Hours of Construction. Hours of construction, including moving of equipment shall be <br />15 limited to the hours between 7 a.m. and 9 p.m. on weekdays and 9 a.m. and 9 p.m. on <br />16 weekends. <br />17 4. Site Maintenance. The Developer shall ensure the contractor maintains a clean work site. <br />18 Measures shall be taken to prevent debris, refuse or other materials from leaving the site. <br />19 Construction debris and other refuse generated from the project shall be removed from <br />20 the site in a timely fashion and/or upon the request by the City Engineer. After the <br />21 Developer has received twenty-four (24) hour verbal notice, the City shall have the right <br />22 to complete or contract to complete the site maintenance work at the Developer’s <br />23 expense, which amount the Developer shall pay to the City upon demand. <br />24 5. Cold Weather Construction. The City requires that no public concrete or bituminous <br />25 infrastructure be constructed on frozen ground. Upon evidence of frozen ground in the <br />26 project aggregate base/subgrade, all concrete and bituminous work shall cease for the <br />27 construction year. No bituminous base paving or concrete pouring will be allowed after <br />stst <br />28 November 1 of the calendar year. Work may be performed after November 1 only with <br />29 the approval of the City Engineer, and if permitted such work shall comply with City <br />30 specifications. <br />31 6. Bituminous and Concrete Material Acceptance. The City shall not accept concrete curb <br />32 and gutter that has structural or cosmetic defects. The City shall identify all defective <br />33 curb for removal. The City shall not accept bituminous base course with less than 91.5% <br />34 density or that has an open graded appearance as determined by the City Engineer. This <br />35 is considered to be rejected and shall be required to be removed at the Developer’s <br />st <br />36 expense. At no time shall the bituminous wear course be installed after October 1 of <br />37 any calendar year or prior to weight restrictions being lifted in the spring. <br />38 7. Televising. All public storm sewer and sanitary sewer shall be televised, at the <br />39 Developer’s expense, prior to the installation of the aggregate base, concrete curb and <br />40 gutter, and bituminous. No roadway construction shall be commenced until the City has <br />41 reviewed and approved the televising tapes. All televising media shall be submitted per <br />42 City requirements. <br />Page 8 of 17 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.