My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 11072022
Roseville
>
City Council
>
City Council Meeting Packets
>
2022
>
CCP 11072022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2022 2:45:13 PM
Creation date
11/3/2022 2:45:01 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
11/7/2022
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville <br />Electrical Permit Fees: Community Development <br />City20222023 <br />Electrical Permit Fee DescriptionCodeAmountProposedComments <br />Minimum feen/a45.00$ 50.00$ No refunds available <br />Services, changes for services:- <br />0 to 300 ampn/a55.00$ 55.00$ <br />400 ampn/a71.00 71.00 <br />500 ampn/a87.00 87.00 <br />600 ampn/a103.00 103.00 <br />n/a135.00 135.00 <br />800 amp <br />1,000 ampn/a167.00 167.00 <br />n/a183.00 183.00 <br />1,100 amp <br />1,200 ampn/a199.00 199.00 <br />Add $16 for each additional 100 amps- - <br />Circuits, changes for services:- - <br />n/a9.00$ 9.00$ <br />0 to 100 amp <br />101 to 200 ampn/a15.00 15.00 <br />n/a21.00 21.00 <br />201 to 300 amp <br />301 to 400 ampn/a27.00 27.00 <br />n/a33.00 33.00 <br />401 to 500 amp <br />501 to 600 ampn/a39.00 39.00 <br />n/a45.00 45.00 <br />601 to 700 amp <br />Add $6 for each additional 100 amps- - <br />Solar Fees:- - <br />0kw-5kwn/a90.00 90.00 <br />5.1kw-10kwn/a150.00 150.00 <br />10.1kw-20kw225.00 225.00 <br />20.1kw-30kwn/a300.00 300.00 <br />30.1kw-49.9kwn/a375.00 375.00 <br />50kw-and largern/a400.00 400.00 <br />Add $25 for each additional 10kwn/a25.00/10kw25.00/10kw <br />Residential panel replacementn/a110.00$ 110.00$ <br />Residential sub paneln/a45.00 45.00 <br />Minimum fee:- <br />Inspection onlyn/a45.00 50.00 Plus $1 State surcharge <br />Rough-in & finaln/a90.00 100.00 Plus $1 State surcharge <br />Single-family dwelling/townhouse < 200 amps *n/a190.00 200.00 Plus $1 State surcharge <br />Apartment buildings (per unit)n/a80.00 90.00 Excludes cover svc, unit feeders <br /> & house panels- <br />Swimming pool (up to two inspections)n/a90.00 100.00 <br />Additions, remodels, basement additionsn/a90.00 100.00 Up to 10 circuits & 2 inspections <br />Accessory structure:- <br />Paneln/a55.00 55.00 <br />Per circuitn/a9.00 9.00 <br />Inspectionn/a90.00 100.00 <br />Traffic signals (per standard)n/a8.00 8.00 <br />Street & parking lot lights (per standard)n/a5.00 5.00 <br />Transformers & Generators:- - <br />Up to 10 KVAn/a5.00 5.00 <br />11-74 KVAn/a40.00 40.00 <br />75-299 KVAn/a60.00 60.00 <br />300+ KVAn/a165.00 165.00 <br />Retro-fit lighting (per fixture)n/a0.85 0.85 <br />Sign transformer (each)n/a9.00 9.00 <br />on/a0.85 0.85 <br />Low voltage fire alarm, low voltage heating and air c <br />Re-inspection fee (in addition to others)n/a45.00 50.00 <br />Hourly rate for carnivals n/a90.00 90.00 <br />Commercial Fees <br />$50 per trip or the fees below, whichever is greater <br />$1 - $1,000 valuation$50 per trip <br />$1,001 - $2,000 valuation$50for the first $1,000 plus $3.25for the first $1,000 plus $3.32 <br />for each additional $100 or fraction <br />thereof, to and including $2,000 <br />$2,001 - $25,000 valuation$82for the first $2,000 plus $14.85 <br />for each additional $1,000 or fraction <br />thereof, to and including $25,000 <br />$25,001 - $50,000 valuation$423.55for the first $25,000 plus $10.70 <br />for each additional $1,000 or fraction <br />thereof, to and including $50,000 <br />$50,001 - $100,000 valuation$691.05for the first $50,000 plus $7.45 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.