Laserfiche WebLink
34 eliminate the need to use the fund balance, the focus of the rate increases turned to make sure the rates <br />35 covered the rising costs for operations (inflationary city costs plus St. Paul Water rate increases). <br />36 <br />37 As a result of all the variables, a scenario was initially created that showed an 8% rate increase would <br />38 cover 2023 operational costs, assuming a portion of the under billing was collected in 2022. This <br />39 information was presented to the Council on Oct. 19. As final disposition of the collection on under <br />40 billing was not finally determined until October 24 and letters notifying customers of their under billing <br />41 amount, it is unlikely that much of the under billings will be paid in 2022. <br />42 <br />43 Due to the under billings, the City has little cash on hand going into 2023 to cover the operational costs. <br />44 If the City had not had the under billing, there would be more cash on hand to absorb the sharp increase <br />45 from St. Paul water and may have somewhat mitigated the rate increase in 2023 and allow the City to <br />46 spread out rate increases over a period of years to cover the increased costs. However, given the <br />47 projected rate increases from St. Paul water and our continued capital needs, a significant rate increase <br />48 over a period of years will still be needed. Having the revenue from the under billings in hand may <br />49 have altered the schedule for the higher rate increases, but they still would have been necessary. <br />50 <br />51 So even though the City Council has directed collection of all of the under billings, staff is still <br />52 recommending an 8% increase in 2023 to ensure sufficient cash flow to cover operational costs. The <br />53 collection of the under billings throughout the year will also help cash flow. From the analysis, the City <br />54 would need to have water rate increases of 8% through 2027, with 2028 being 7%. <br />55 <br />56 However, in full acknowledgement that the rate increase along with the collection of under billings <br />57 from some customers may be burdensome to rate payers, it has been determined that 7% rate increase <br />58 in 2023 followed by rate increases of 8% through 2028 would also be acceptable. For the average <br />59 single-family user, the difference between a 7% and 8% increase in 2023 would be $3.36 annually. <br />60 <br />61 Storm Drainage Operations <br />62 The City provides for the management of storm water drainage to prevent flooding and pollution <br />63 control, as well as the street sweeping program. Based on the 2021 Utility Rate Study done by Ehlers, a <br />64 4% increase is recommended for 2022-2024 to cover fixed and variable costs of the Storm Drainage <br />65 fund and a 1% increase thereafter. Public Works did an intensive analysis of the infrastructure in the <br />66 Storm Drainage system and identified a significant increase in capital improvements over the next 20 <br />67 years. Although the initial improvements have been curtailed, they are still significant. The current <br />68 update of the utility rate study is recommending a 33% increase for 2023 and 2024 and then a 2.5% <br />69 thereafter. While the percentage seems high, the actual dollar amount change is about $5 per quarter <br />70 for residential properties. <br />71 <br />72 Sanitary Sewer Operations <br />73 The City maintains a sanitary sewer collection system to ensure the general public’s health and general <br />74 welfare. Ehlers included a review of the rates for Sanitary Sewer in this year’s Utility Rate Study and is <br />75 recommending a 2% increase. For 2022, the city increased the base rates by 3.5% and the usage rates <br />76 by 1.92%. Public Works made some reductions in the proposed capital improvement projects so the <br />77 2% increase recommended by Ehlers is adequate for this fund. <br />78 <br />79 Recycling Operations <br />80 The recycling operation provides for the contracted curbside recycling pickup throughout the City and <br />81 related administrative costs. The primary operating cost is the amounts paid to a contractor to pick up <br />82 recycling materials. In 2021, the City solicited bids on the recycling operations. On July 26, 2021, the <br />Page 2 of 5 <br /> <br />