Laserfiche WebLink
Disconnect: residential 85.00 85.00 <br />Disconnect: commercial 169.00 169.00 <br />Sewer Connection/Inspection Permit Fee - Engineering: - - <br />Connection: residential 25.00 25.00 <br />Connection: commercial 75.00 75.00 <br />Connection: repair 25.00 25.00 <br />Connection: inspection 75.00 75.00 <br />Disconnect: residential 25.00 25.00 <br />Disconnect: commercial 75.00 75.00 <br />Sign Permit Fee - Community Development: - <br />Permanent sign (minimum fee)Per Building Permit Fee Sched. ($55 min fee) <br />Annual sign 100.00 100.00 <br />Temporary sign 30.00 30.00 <br />Attention-getting device 30.00 30.00 <br />Swimming Pool Permit - Community Development: - - <br />Residential: in-ground 212.00 212.00 <br />CommercialPer Building Permit Fee Sched. ($55 min fee) <br />Swimming Pool Permit - Engineering 15.00 15.00 <br />Water Connection Permit Fee - Community Develop: - - <br />Residential 96.00 96.00 <br />Commercial 303.00 303.00 <br />Repair 61.00 61.00 <br />Disconnect: residential 85.00 85.00 <br />Disconnect: commercial 169.00 169.00 <br />Water Connection/Inspection Permit Fee - Engineering: - - <br />Connection: residential 25.00 25.00 <br />Connection: commercial 75.00 75.00 <br />Connection: repair 25.00 25.00 <br />Connection: inspection 75.00 75.00 <br />Disconnect: residential 25.00 25.00 <br />Disconnect: commercial 75.00 75.00 <br />Water Meter Program Fees - Engineering: - - <br />Manual meter read surcharge 20.00 20.00per quarter <br />Non-standard water meter no-read fee 50.00 50.00 <br />Denial of access to water meter 100.00 100.00per quarter <br />Utility Disconnect Fee 5,000.00 5,000.00 <br />Miscellaneous Permit Fees: - - <br />Administrative fee for Accelerated abatement 125.00 125.00 <br />Administrative fee-Council Approved Abatement 350.00 350.00 <br />Administrative fee: other zones 69.50 69.50 <br /> 69.50 69.50 <br />Administrative fee: R1 or R2 zones <br />Backflow prevention investigation fee 75.00 75.00 <br /> 102.00 102.00Special conditions <br />Certificate of Occupancy: conditional <br />Certificate of Occupancy: copyn/cn/c <br /> 25.00 25.00 <br />Certificate of Occupancy: full <br />City contractor license fee 63.00 63.00 <br /> 5,000.00 5,000.00 <br />Construction deposit: commercial <br />Construction deposit: residential 1,000.00 1,000.00 <br />Drain tile 115.00 115.00 <br />Driveway permits: residential replacement 55.00 55.00 <br />Driveway permits: residential expansion 75.00 75.00Plus $25 Engineering fee <br />Fence permits: residential 52.00 52.00 <br />Fence permits: commercial - <br />Footing/foundation permits: commercialPer Building Permit Fee Schedule, Valuation <br />Per Building Permit Fee Schedule, Valuation <br />Footing/foundation permits: residential <br />Garage only (detached: roofing & siding) 56.00 56.00 <br />Other - - <br />Outdoor sales/display permit: 1-5 occurrences <br /> 50.00 50.00 <br />Outdoor sales/display permit: 6-10 occurrences 75.00 75.00 <br />Outdoor sales/display permit: 11 or more 200.00 200.00 <br />Outdoor storage/display permit: 1-5 occurrences <br /> 50.00 50.00 <br /> <br />