Laserfiche WebLink
*128. Permit item 21.9: Do you inspect structural stormwater BMPs (excluding stormwater ponds, which are under a separate <br />schedule) each calendar year to determine structural integrity, proper function, and maintenance needs (excluding structural <br />stormwater BMPs where the inspection frequency has been adjusted)? <br />0 Yes <br />❑ No <br />*129. Do you have a different inspection frequency (i.e., more or less than each calendar year) for any of your structural <br />stormwater BMPs? <br />0 Yes <br />❑ No (Skip to Q131) <br />130. If yes in Q129, what led to your adjusted inspection frequency? (Check all that apply) <br />130.A. ❑ Complaints received or patterns of maintenance indicated a greater frequency was necessary. <br />130.13. ❑ Determined maintenance or sediment removal was not required after completion of the first two calendar year <br />inspections. <br />130.C. 0 Other (describe below): <br />130.D. Inspection and maintenance of the city's structural bmp's on a monthly basis during the growing season is <br />cheaper and easier to maintain. It also ensures the bmp's are functioning as intended. <br />*131. Permit item 21.10: Do you inspect all ponds and outfalls (excluding underground outfalls) each permit term in order to <br />determine structural integrity, proper function, and maintenance needs? <br />0 Yes <br />❑ No (Skip to Q133) <br />132. If yes in Q131, describe the frequency of inspections: <br />At a minimum, the city has scheduled to inspect 20% of our ponds and outfalls. Most years, staff are able to inspect all of <br />our ponds and outfalls given our current staffing and budget. <br />*133. Permit item 21.12: Do you implement a stormwater management training program commensurate with individual's <br />responsibilities as they relate to your SWPPP, including reporting and assessment activities? Training materials can be from <br />the U.S. Environmental Protection Agency (EPA), state and regional agencies, or other organizations as appropriate to <br />meet this requirement. <br />® Yes <br />❑ No (Skip to Q135) <br />134. If yes in Q133, what does your stormwater management training program include? (Check all that apply) <br />134.A. 0 The importance of protecting water quality. <br />134.13. 0 Cover the requirements of the permit relevant to the responsibilities of the individual. <br />134.C. ❑X A schedule that establishes initial training for individuals, including new and/or seasonal employees, and <br />recurring training intervals to address changes in procedures, practices, techniques, or requirements. <br />134.D. ❑ Other (describe below): <br />134. E. <br />134.F. Additional information for checked items (optional): <br />*135. Permit item 21.13: Do you document information associated with the operations and maintenance program? <br />0 Yes <br />❑ No (Skip to Q137) <br />136. If yes in Q135, what are you documenting? (Check all that apply) <br />136.A. 0 Date(s) and description of findings, including whether or not an illicit discharge is detected, for all inspections <br />conducted in accordance with items 21.9 and 21.10. <br />136.13. 0 Any adjustments to inspection frequency as authorized in item 21.9. <br />136.C. 0 Date(s) and a description of maintenance conducted as a result of inspection findings, including whether or not <br />an illicit discharge is detected. <br />https://www.pca.state.mn.us 651-296-6300 800-657-3864 Use your preferred relay service Available in alternative formats <br />wq-strm4-49a • 9123120 Page 25 of 32 <br />