My WebLink
|
Help
|
About
|
Sign Out
Home
2022_0524_PWETCPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2022
>
2022_0524_PWETCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 9:54:02 AM
Creation date
1/26/2023 9:44:34 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/24/2022
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
144.D. ❑X Removal of organic matter via street sweeping. <br />144.E. ❑X Implementation of infiltration structural stormwater BMPs. <br />144.F. 0 Management of areas that attract dense populations of waterfowl (e.g., riparian plantings). <br />144.G. ❑ Other (describe below): <br />144. H. <br />145. Permit item 12.9: If yes in Q141, who is or will be responsible for implementation of this required component (i.e., <br />inventory, plan, and BMP implementation)? List name(s) or position title(s): <br />Environmental Manager <br />*146. Permit item 22.5: Do you have an applicable WLA where a reduction in pollutant loading is required for chloride? <br />❑X Yes <br />❑ No (Skip to Q151) <br />147. If yes in Q146, do you document the amount of deicer applied each winter maintenance season to all your <br />owned/operated surfaces? (Note: All or some of this item is a new permit requirement. Compliance with new <br />requirements is required within 12 months after receiving permit coverage.) <br />❑X Yes <br />❑ No <br />148. If yes in Q146, each calendar year do you conduct an assessment of your winter maintenance operations to reduce <br />the amount of deicing salt applied to your owned/operated surfaces and determine current and future opportunities <br />to improve BMPs? You may use the MPCA's Smart Salting Assessment Tool or other available resources and <br />methods to complete this assessment. The assessment must be documented. (Note: All or some of this item is a <br />new permit requirement. Compliance with new requirements is required within 12 months after receiving permit <br />coverage.) <br />❑X Yes <br />❑ No (Skip to Q150) <br />149. If yes in Q148, what does your winter maintenance operations assessment include? (Check all that apply) <br />149.A. ❑X Operational changes such as pre -wetting, pre -treating the salt stockpile, increasing plowing prior to deicing, <br />monitoring of road surface temperature, etc. <br />149.13. ❑X Implementation of new or modified equipment providing pre -wetting, or other capability for minimizing salt use. <br />149.C. 0 Regular calibration of equipment. <br />149.D. 0 Optimizing mechanical removal to reduce use of deicers. <br />149.E. 0 Designation of no salt and/or low salt zones. <br />149.F. ❑ Other (describe below): <br />149.G. <br />149.H. Additional information for checked items (optional): <br />150. Permit item 12.9: If yes in Q146, who is or will be responsible for implementation of this required component (i.e., <br />documenting deicer applied and winter maintenance operations assessment)? List name(s) or position title(s): <br />Environmental Manager <br />*151. Permit item 22.7: Do you have an applicable WLA where a reduction in pollutant loading is required for temperature? <br />❑ Yes <br />❑X No (Skip to Q155) <br />https://www.pca.state.mn.us 651-296-6300 800-657-3864 Use your preferred relay service Available in alternative formats <br />wq-strm4-49a • 9123120 Page 28 of 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.