Laserfiche WebLink
For question 159.B-G, provide information for calendar year 2020. <br />159.B. For each month, provide the number of days the system was operational: <br />159.B.1. <br />January: <br />159.B.2. <br />February: <br />159.B.3. <br />March: <br />159.B.4. <br />April: <br />159.B.5. <br />May: <br />159.B.6. <br />June: <br />159.B.7. <br />July: <br />159.B.8. <br />August: <br />159.B.9. <br />September: <br />159. B.10. <br />October: <br />159.B.11. <br />November: <br />159.B.12. <br />December: <br />159.C. What chemical(s) <br />was used for treatment: <br />159.C.1. <br />❑ Alum <br />159.C.2. <br />❑ Ferric Chloride <br />159.D. Provide the number of gallons of water treated: <br />159.E. Provide the number of gallons of alum orferric chloride treatment used: <br />159.F. Provide the calculated pounds of phosphorous removed: <br />159.G. Describe any performance issue(s) and the corrective action(s), including the date(s) when corrective action(s) were <br />taken: <br />160. Permit item 23.3: Which of the following requirements are you meeting? (Check all that apply) <br />160.A. ❑ Your treatment system is for the treatment of phosphorus in stormwater. Non-stormwater discharges must not <br />be treated by this system. <br />160.B. ❑ Your treatment system is contained within the conveyances and structural stormwater BMPs of the MS4. The <br />utilized conveyances and structural stormwater BMPs do not include any receiving waters. <br />160.C. ❑ Phosphorus treatment systems utilizing chemicals other than alum or ferric chloride receive written approval <br />from the MPCA. <br />160.D. ❑ In -lake phosphorus treatment activities are not authorized. <br />161. Permit item 23.3: Which of the following design parameters does your treatment system include? (Check all that apply) <br />161.A. ❑ The treatment system is constructed in a manner that diverts the stormwater flow to be treated from the main <br />conveyance system. <br />161.B. ❑ A high flow bypass is part of the inlet design. <br />161.C. ❑ A flocculent storage/settling area is incorporated into the design, and adequate maintenance access is <br />provided (minimum of eight feet wide) for the removal of accumulated sediment. <br />162. Permit item 23.5: Do you have a designated person perform visual monitoring of the treatment system for proper performance <br />at least once every seven (7) days, and within 24 hours after a rainfall event greater than 2.5 inches in 24 hours? <br />❑ Yes <br />❑ No (Skip to Q164) <br />163. If yes in Q162, please list the name(s) of the individual(s) or position title(s): <br />https://www.pca.state.mn.us 651-296-6300 800-657-3864 Use your preferred relay service Available in alternative formats <br />wq-strm4-49a • 9123120 Page 30 of 32 <br />