Laserfiche WebLink
Coverage issued: October 28, 2021 <br />Permit expires: November 15, 2025 <br />MS400047 <br />Page 4 of 28 <br />6.1 <br />Transfer of Ownership or Control. [Minn. R. 7001, Minn. R. 7090.0080] <br />6.2 <br />Where the ownership or significant operational control of the small MS4 changes after the submittal of an application in <br />accordance with Sections 9 through 12, the new owner/operator must submit a new application in accordance with <br />Sections 9 through 12. [Minn. R. 7090] <br />7.1 <br />Issuance of Individual Permits. [Minn. R. 7001] <br />7.2 <br />The permit applicant may request an individual permit in accordance with Minn. R. 7001.0210, subp. 6, for authorization to <br />discharge stormwater associated with a small MS4. [Minn. R. 7001.0210, subp. 6] <br />7.3 <br />The Commissioner may require an individual permit for the permit applicant or permittee covered by a general permit, in <br />accordance with Minn. R. 7001.0210, subp. 6. [Minn. R. 7001.0210, subp. 6] <br />8.1 <br />Rights and Responsibilities. [Minn. R. 7001, Minn. R. 7090] <br />8.2 <br />The Commissioner may modify the General Permit or issue other permits, in accordance with Minn. R. 7001, to include <br />more stringent effluent limitations or permit requirements that modify or are in addition to the Minimum Control <br />Measures of the General Permit, or both. These modifications may be based on the Commissioner's determination that <br />such modifications are needed to protect water quality. [Minn. R. 7001] <br />8.3 <br />The Commissioner may designate additional small MS4s for coverage under the General Permit in accordance with <br />Minn. R. 7090. The owner/operator of a small MS4 that is designated for coverage must comply with the permit <br />requirements by the dates specified in the Commissioner's determination. [Minn. R. 7090] <br />9.1 <br />Application for Reissuance. [Minn. R. 7001] <br />9.2 <br />If an existing permittee desires to continue permit coverage beyond the expiration date, the permittee must submit <br />an application for permit reissuance: Due by 180 days prior to permit expiration. [Minn. R. 7001.0040, subp. 3] <br />10.1 <br />New Permittee Applicants. [Minn. R. 7090] <br />10.2 <br />To become a new permittee authorized to discharge stormwater under the General Permit, the owner/operator of a <br />small MS4 must submit an application, on a form provided by the Agency, in accordance with the schedule in Appendix B, <br />Table 3, and the following requirements: <br />a. submit Part 1 of the permit application (includes the permit application fee); and <br />b. submit Part 2 of the permit application, also known as the Stormwater Pollution Prevention Program (SWPPP) document, <br />in accordance with Section 12. [Minn. R. 7090] <br />11.1 <br />Existing Permittee Applicants. [Minn. R. 7090] <br />11.2 <br />All existing permittees seeking to continue discharging stormwater associated with a small MS4 after the issuance date <br />of the General Permit must submit Part 2 of the permit application: Due by 150 days after permit issuance. <br />Existing permittees were required to submit Part 1 of the permit application prior to the expiration date (July 31, 2018) <br />of the Agency's small MS4 general permit No.MNR040000, effective August 1, 2013. [Minn. R. 7090] <br />12.1 <br />Stormwater Pollution Prevention Program (SWPPP) Document. [Minn. R. 7090] <br />12.2 <br />All applicants must submit a SWPPP Document (i.e., Part 2 of the permit application) when seeking coverage under the <br />General Permit. The SWPPP Document will become an enforceable part of the General Permit upon approval by the <br />Agency. Modifications to the SWPPP Document that are required or allowed by the General Permit (see Section 24) will <br />also become enforceable provisions. The applicant must submit the SWPPP Document on a form provided by the Agency. <br />The applicant's SWPPP Document must include items 12.3 through 12.11, as applicable. [Minn. R. 7090] <br />12.3 <br />The applicant must provide a description of partnerships with another regulated small MS4(s), into which the applicant has <br />entered in order to satisfy one or more requirements of the General Permit. [Minn. R. 7090] <br />12.4 <br />The applicant must provide a description of each program the applicant has developed and implemented to satisfy the <br />Minimum Control Measure (MCM) requirements, including: <br />a. the Best Management Practices (BMPs) the applicant has implemented for each MCM at the time of application; <br />b. the status of each required component of the program; and <br />c. name(s) of individual(s) or position titles responsible for implementing and/or coordinating each component of the <br />program. <br />