Laserfiche WebLink
Coverage issued: October 28, 2021 <br />Permit expires: November 15, 2025 <br />M5400047 <br />Page 11 of 28 <br />are part of a larger common plan of development or sale, of the need to apply for and obtain coverage under the <br />CSW Permit; and <br />b. use of a written checklist, consistent with the requirements of the regulatory mechanism(s), to document the adequacy <br />of each site plan required in item 19.5. [Minn. R. 7090] <br />19.7 <br />The permittee must implement an inspection program that includes written procedures for conducting site inspections, <br />to determine compliance with the permittee's regulatory mechanism(s). The inspection program must also meet the <br />requirements in items 19.8 and 19.9. [Minn. R. 7090] <br />19.8 <br />The permittee must maintain written procedures for identifying high -priority and low -priority sites for inspection. At a <br />minimum, the written procedures must include: <br />a. a detailed explanation describing how sites will be categorized as either high -priority or low -priority; <br />b. a frequency at which the permittee will conduct inspections for high -priority sites; <br />c. a frequency at which the permittee will conduct inspections for low -priority sites; and <br />d. the name(s) of individual(s) or position title(s) responsible for conducting site inspections. [Minn. R. 7090] <br />19.9 <br />The permittee must implement a written checklist to document each site inspection when determining compliance with <br />the permittee's regulatory mechanism(s). At a minimum, the checklist must include the permittee's inspection findings on <br />the following areas, as applicable to each site: <br />a. stabilization of exposed soils (including stockpiles); <br />b. stabilization of ditch and swale bottoms; <br />c. sediment control BMPs on all downgradient perimeters of the project and upgradient of buffer zones; <br />d. storm drain inlet protection; <br />e. energy dissipation at pipe outlets; <br />f. vehicle tracking BMPs; <br />g. preservation of a 50 foot natural buffer or redundant sediment controls where stormwater flows to a surface water <br />within 50 feet of disturbed soils; <br />h. owner/operator of construction activity self -inspection records; <br />i. containment for all liquid and solid wastes generated by washout operations (e.g., concrete, stucco, paint, form release <br />oils, curing compounds, and other construction materials); and <br />j. BMPs maintained and functional. [Minn. R. 7090] <br />19.10 <br />The permittee must implement written procedures for receipt and consideration of reports of noncompliance or other <br />stormwater related information on construction activity submitted by the public to the permittee. [Minn. R. 7090] <br />19.11 <br />The permittee must ensure that individuals receive training commensurate with their responsibilities as they relate to the <br />permittee's Construction Site Stormwater Runoff Control program. Individuals includes, but is not limited to, individuals <br />responsible for conducting site plan reviews, site inspections, and/or enforcement. The permittee must ensure that <br />previously trained individuals attend a refresher -training every three (3) calendar years following the initial training. <br />[Minn. R. 7090] <br />19.12 <br />The permittee must maintain written enforcement response procedures (ERPs) to compel compliance with the permittee's <br />regulatory mechanism(s) in item 19.3. At a minimum, the written ERPs must include: <br />a. a description of enforcement tools available to the permittee and guidelines for the use of each tool; and <br />b. name or position title of responsible person(s) for conducting enforcement. [Minn. R. 7090] <br />19.13 <br />For each site plan review conducted by the permittee, the permittee must document the following: <br />a. project name; <br />b. location; <br />c. total acreage to be disturbed; <br />d. owner and operator of the proposed construction activity; <br />e. proof of notification to obtain coverage under the CSW Permit, as required in item 19.6, or proof of coverage under the <br />CSW Permit; and <br />f. any stormwater related comments and supporting completed checklist, as required in item 19.6, used by the permittee to <br />determine project approval or denial. [Minn. R. 7090] <br />