Laserfiche WebLink
Coverage issued: October 28, 2021 <br />Permit expires: November 15, 2025 <br />M5400047 <br />Page 20 of 28 <br />a. a BMP is added, and none subtracted, from the SWPPP; or <br />b. a less effective BMP is replaced with a more effective BMP. The alternate BMP must address the same, or similar, <br />concerns as the ineffective or failed BMP. [Minn. R. 7090] <br />25.1 <br />Annual Assessment, Annual Reporting, and Recordkeeping. [Minn. R. 7090] <br />25.2 <br />The permittee must conduct an annual assessment to evaluate compliance with the terms and conditions of the <br />General Permit, including the effectiveness of the components of the SWPPP and the status of achieving the measurable <br />requirements in the General Permit. Measurable requirements are activities that must be documented or tracked <br />(e.g., education and outreach efforts, implementation of written plans, inventories, trainings, site plan reviews, inspections, <br />enforcement, etc.). The permittee must perform the annual assessment prior to completion of each annual report and <br />document any modifications made to the SWPPP as a result of the annual assessment. [Minn. R. 7090] <br />25.3 <br />The permittee must submit an annual report: Due annually, by the 30th of June. The annual report must cover the <br />portion of the previous calendar year during which the permittee was authorized to discharge stormwater under the <br />General Permit. The annual report shall be submitted to the Agency, in a manner determined by the Agency, that includes <br />but is not limited to: <br />a. the status of compliance with permit terms and conditions, including an assessment of the appropriateness of BMPs <br />identified by the permittee and progress towards achieving the measurable requirements of each of the MCMs. The <br />assessment must be based on results of information collected and analyzed, including monitoring (if any), inspection <br />findings, and public input received during the reporting period; <br />b. the stormwater activities the permittee plans to undertake during the next reporting cycle; <br />c. a change in any identified BMPs for any of the MCMs; <br />d. the summary required in item 22.2 to demonstrate progress toward achieving applicable WI -As; <br />e. information required to be recorded or documented in Sections 13 through 24; and <br />f. a statement that the permittee is relying on a partnership(s) with another regulated small MS4(s) to satisfy one or <br />more permit requirements (if applicable), and what agreements the permittee has entered into in support of this effort. <br />[Minn. R. 7090] <br />25.4 <br />The permittee must make records, including components of the SWPPP, available to the public at reasonable times during <br />regular business hours (see 40 CFR 122.7 for confidentiality provision). [Minn. R. 7090] <br />25.5 <br />The permittee must retain copies of the permit application, all documentation necessary to comply with SWPPP <br />requirements, all data and information used by the permittee to complete the application process, and any information <br />developed as a requirement of the General Permit or as requested by the Commissioner, for a period of at least three (3) <br />years beyond the date of permit expiration. This period is automatically extended during the course of an unresolved <br />enforcement action regarding the small MS4 or as requested by the Commissioner. [Minn. R. 7001.0080, Minn. R. 7090] <br />25.6 <br />The permittee must, when requested by the Commissioner, submit within a reasonable time the information and reports <br />that are relevant to the control of pollution regarding the construction, modification, or operation of the facility covered by <br />the General Permit or regarding the conduct of the activity covered by the General Permit. [Minn. R. 7001.0150, subp. 3(H), <br />Minn. R.7090] <br />25.7 <br />The permittee must use an electronic submittal process, as provided by the Agency, to submit information required by <br />the General Permit. If electronic submittal is not available, the permittee must use the following mailing address: <br />Supervisor, Municipal Stormwater Unit <br />Minnesota Pollution Control Agency <br />520 Lafayette Road North <br />St. Paul, Minnesota 55155-4194. [Minn. R. 7090] <br />26.1 <br />General Conditions. [Minn. R. 7090] <br />26.2 <br />The Agency's issuance of a permit does not release the permittee from any liability, penalty, or duty imposed by Minnesota <br />or federal statutes or rules or local ordinances, except the obligation to obtain the General Permit. [Minn. R. 7001.0150, <br />subp. 3(A)] <br />26.3 <br />The Agency's issuance of a permit does not prevent the future adoption by the Agency of pollution control rules, standards, <br />or orders more stringent than those now in existence and does not prevent the enforcement of these rules, standards, or <br />