Coverage issued: October 28, 2021 <br />Permit expires: November 15, 2025 <br />Table 3: <br />New Permittees - Schedule of permit requirements <br />MS400047 <br />Page 28 of 28 <br />Permit requirement <br />Schedule <br />Section 10. New Permittee Applicants <br />• Submit Part 1, and Part 2 of the permit application as required <br />• Within 18 months of written notification from the <br />by Section 12. <br />Commissioner that the MS4 meets the criteria in <br />Minn. R. 7090.1010, subp. 1.A. or B. and General Permit <br />coverage is required. <br />Section 13. Stormwater Pollution Prevention Program (SWPPP) <br />• Complete all requirements of Sections 14 -23. <br />• Within 36 months of the date General Permit coverage is <br />extended, unless other timelines have been specifically <br />established in the General Permit and identified below; or <br />• Within timelines established by the Commissioner in item 8.3. <br />Section 14. Mapping <br />• Develop a storm sewer system map. <br />• Within 24 months of the date General Permit coverage is <br />extended. <br />Section 18. Illicit Discharge Detection and Elimination <br />• Develop, implement, and enforce an Illicit Discharge Detection <br />• Within 12 months of the date General Permit coverage is <br />and Elimination Program. <br />extended. <br />Section 19. Construction Site Stormwater Runoff Control <br />• Develop, implement, and enforce a Construction Site <br />• Within 12 months of the date General Permit coverage is <br />Stormwater Runoff Control Program. <br />extended. <br />• When the CSW Permit is reissued, revise regulatory <br />• Within 12 months of the issuance date of the CSW Permit <br />mechanism(s), if necessary, to be at least as stringent as the <br />(expected issuance date of the CSW Permit is August 1, 2023). <br />requirements for erosion, sediment, and waste controls <br />described in the CSW Permit. <br />Section 20. Post -Construction Stormwater Management <br />• Develop, implement, and enforce a Post -Construction <br />• Within 24 months of the date General Permit coverage is <br />Stormwater Management program. <br />extended. <br />Section 21. Pollution Prevention/Good Housekeeping for <br />Municipal Operations <br />• Conduct structural storm water BMP inspections. <br />• Each calendar year. <br />• Conduct pond and ouifall inspections. <br />• Prior to the expiration date of the General Permit. <br />Section 22. Discharges to Impaired Waters with a USEPA- <br />Approved TMDL that includes an Applicable WLA <br />• Submit all information required in item 22.2. <br />• With each annual report. <br />• Meet requirementsfor applicable WLAsfor bacteria, chloride, <br />• Within 12months ofthe date General Permit coverage is <br />and temperature in Section 22. <br />extended. <br />Section 23. Alum or Ferric Chloride Phosphorus Treatment <br />Systems (if applicable) <br />• Meet requirements for treatment systems in Section 23. <br />• Within 12 months of the date General Permit coverage is <br />extended. <br />Section 25. Annual SWPPP Assessment, Annual Reporting, and <br />Recordkeeping <br />• Conduct assessment of the SWPPP. <br />• Prior to completion of each annual report. <br />• On o form provided by the Agency, submit an annual report. <br />• By June 30`h of each calendar year. <br />