Laserfiche WebLink
Stormwater <br />Fairview & C Pond <br />Project Overview <br />• Project Cost: $331,331.00 (bid price) <br />• Cost Share: $0.00 <br />• Volume Reduction: 0.00 cu-ft <br />• HWL Reduction (ft): 0.005 <br />• Phosphorus Reduction: <br />• 3lbs/year <br />• —110,000/lbs TP/year <br />