My WebLink
|
Help
|
About
|
Sign Out
Home
2022_0524_PWETCPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2022
>
2022_0524_PWETCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 9:54:02 AM
Creation date
1/26/2023 9:44:34 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/24/2022
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Project Overview <br />C2 & Simpson Underground Infiltration <br />• Project Cost: $250,000 <br />• Cost Share: $100,000 (RCWD) <br />• Volume Reduction: —14,000 cu-ft <br />• HWL Reduction (ft): —0.5' (C2 & Simpson) <br />• Phosphorus Reduction: <br />• Total phosphorus load: 3.9 Ibs <br />• Filtration: 2.2 Ibs reduction (—$113,600/lbs TP) <br />
The URL can be used to link to this page
Your browser does not support the video tag.