Laserfiche WebLink
5/1822, 1:54 PM MS4 Annual Report for 2021 <br />Q48 How are sites prioritized for inspections? Check all that apply. <br />12 Site topography <br />ea Soil characteristics <br />12 Types of receiving waters) <br />12 Stage of construction <br />12 Compliance history <br />0 Weather conditions <br />0 Citizen complaints <br />12 Project size <br />O Other <br />Q49 Do you have a checklist or other written means to document site inspections when determining compliance? [Part II I.D.4.d.(4)] <br /># Yes <br />O No <br />Q5O Enter the number of site inspections conducted for sites an acre or greater between January 1, 2021 and December 31, 2021: <br />7s <br />Q51 Enter the frequency at which site inspections are conducted (e.g. daily, weekly, monthly): [Part III.D.4.d.(2)] <br />Every 9 days or after a 0.5" rainfall, whichever is sooner <br />Q52 Enter the number of trained inspectors that were available for construction site inspections between January 1, 2021 and <br />December 31, 2021: <br />3 <br />Q53 Provide the contact information for the inspector(s) and/or organization that conducts construction stormwater inspections for <br />your MS4. List your primary construction stormwater contact first if you have multiple inspectors. <br />(1)Inspector Dana Stevens <br />name <br />Organization City of Roseville <br />(OfficePhone ) 552-752-7047 <br />Phone <br />(Work Cell) <br />Email Jana.stevens@cityofroseville.com <br />Preferred <br />contact email <br />method <br />(2)Inspector Dan Turner <br />name <br />Organization City of Roseville <br />(OfficePhone ) 552-752-7045 <br />Phone <br />(Work Cell) <br />Email dan.turner@cityofroseville.com <br />Preferred <br />contact email <br />method <br />(3)Inspector Abe Al-Qudah <br />name <br />Organization City of Roseville <br />(OfficePhone ) 552-752-7046 <br />Phone <br />(Work Cell) <br />Email abe.al-qudah@cityofroseville.com <br />Preferred <br />contact email <br />method <br />Q55 Between January 1, 2021 and December 31, 2021, did you modify your BMPs, measurable goals, or future plans for your <br />construction site stormwater runoff control program? [Part IV.B] <br />OYes <br />O No <br />https://su wey.mn.gov/siam/su weylanding/printerviewer.asp?sid=37f44a97ae6948Ob9l fO7Oa11 a28c4e5 7/10 <br />