Laserfiche WebLink
2023 Public Works Work Plan <br />2022 Accomplishments <br />Developments/Permits <br />• Right of Way Permits - 228 <br />• New Erosion Control Permits — 39 <br />• Currently opened sites - 45 <br />• Erosion Control Inspections —496 <br />• Building Permits Reviewed — 295 <br />• Traffic Studies for Developments - 2 <br />• Plat Development Reviews - 4 <br />Miscellaneous <br />• Civic Campus Master Plan Study <br />• Easement & ROW Vacations - 6 <br />• Engineering services for Falcon <br />Heights <br />• Over 640 hours <br />Construction <br />• Resurfaced 9.50 miles of roadway <br />• Resurfaced 0.40 miles of pathways <br />• Install 4 new pathway segments <br />resulting in 0.5 miles of new <br />pathways <br />• Replaced 0.50 miles of watermain <br />• Lined 5.9 miles of sanitary sewer <br />• Completed 1 major sewer repairs <br />• Installed new underground storage <br />Simpson Street <br />• Resurface 3 parking lots <br />Maintenance <br />• Meter Replacements— 739 <br />• 85-90% were radio <br />issues. <br />• Watermain Breaks-23 <br />• Plow Events (2021-2022 <br />Winter) - 21 <br />