Laserfiche WebLink
2023 Public Works Work Plan <br />Pathway Improvements <br />Will <br />_0ii <br />- <br />��i•�1;�� <br />I'm� <br />�II <br />Ion Mf� <br />1 ' <br />_ <br />�� -oil <br />. <br />• <br />nn <br />N <br />Pathway Improvements <br />New Pathways — 0.41 miles <br />• Twin Lakes Trail Phase 2 <br />• Connect existing Twin Lakes Trail <br />pathway from Terrace into Oasis <br />Park. <br />• Lexington Avenue <br />• Fill gap in network between TH 36 <br />and County Road B2 <br />• Marion Street Pathway Phase 2 <br />• Connect existing Marion Street <br />pathway form the cul-de-sac to <br />Larpenteur Avenue. <br />• Cleveland Avenue <br />• Fill gap in network between Iona <br />Avenue and Colder Products <br />Resurfacing — 2.21 miles <br />• County Road B, Lexington Avenue <br />• Lexington Park <br />• Lexington Park Parking Lot <br />