Laserfiche WebLink
<br />o Reservoir Woods Invasive brush and small tree removal around the top of the historic <br />1888 open reservoir, improving the ability to see this historic feature <br />o Villa Park North Installation of several thousand woodland flower plugs. Funded <br />through MN DNR Expedited Conservation Projects (ECP) Grant <br />o Park system wide Completion of work related to the natural resources components of <br />the Park Renewal Program, which began in 2014. <br /> Park Project Areas 2023 (Capital Improvement Items) <br />o Playground Replacements <br /> Pocahontas Park <br /> 3 neighborhood meetings <br /> Community build <br /> Start this winter <br /> Lexington Park <br /> Meeting schedule TBD <br /> Unique process <br /> Potential for more inclusive play <br /> More discussion in 2023 <br /> Park Project Areas 2023 (Capital Improvement Items) <br />o Facility Improvements <br /> Central Park Victoria Tennis Courts <br /> Concordia Park <br /> Gymnastics Center equipment <br /> Skate park equipment pieces at the OVAL <br />o Pathway Connections <br /> Central Park Victoria (adjacent to tennis courts) <br /> Pathway Into Oasis Park from the South <br /> Planning and Design 2023 <br />o Lexington Woods <br /> Lexington between C2 and Woodhill <br /> Tentative concept is predominantly a conservation parcel with pathway and <br />benches <br /> Community engagement via mailing and open house <br />o Midland Legacy Area <br /> Co. Rd. B and Eustis <br /> Multiple meetings <br /> Likely will involve a consultant <br /> Funding and implementation likely in 2024 <br /> Park Project With Outside Funding 2023 (Park Maintenance Operational Projects) <br />o Arboretum Pathway Project <br /> Funded by Central Park Foundation <br />7 <br /> <br /> <br />