Laserfiche WebLink
Roseville Pathway System <br />Background <br />• Existing Pathways <br />• 36.4 miles of <br />MOMMIN <br />=[O%Vlii Ume 1 <br />bituminous trails <br />• Design Standards <br />• Preference to install <br />pathway <br />• 2nd option to install 6' <br />sidewalk <br />NOM <br />MEE <br />U1,©�sl <br />.. � <br />N <br />