Laserfiche WebLink
g. No fertilizer shall be used in establishing new buffer areas except on highly <br />disturbed sites when necessary to establish acceptable buffer vegetation and then <br />limited to amounts indicated by an accredited soil testing laboratory. <br />by the Qjt5 . <br />i. Buffer areas (both natural and created) shall be protected by erosion and sediment <br />control measures during construction in accordance with Section 803.04 Erosion <br />and Sediment Control. The erosion and sediment control measures shall remain in <br />place until the vegetation is established. <br />j. Buffer vegetation shall be activelyaged throughout the three-year <br />establishment period. This includes but is not limited to: mowing overseeding, <br />spot weed control, prescribed burning, and watering <br />k. Buffer vegetation shall be established and maintained in accordance with the <br />requirements above. During the first three full growing seasons the applicant or <br />developer must replant any buffer vegetation that does not survive. The applicant <br />or developer shall specify a method acceptable to the City for monitoring <br />compliance and verifying establishment of the buffer at the end of the third full <br />growing season. <br />Section 3. Effective Date. This ordinance amendment to the City Code shall take effect upon <br />passage and publication of this ordinance. <br />Passed this 20t' day of March 2023 <br />