My WebLink
|
Help
|
About
|
Sign Out
Home
Ord_1629
Roseville
>
City Council
>
City Council Ordinances
>
1600
>
Ord_1629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2023 12:06:48 PM
Creation date
3/21/2023 12:05:37 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Meeting Date
3/20/2023
Meeting Type
Regular
Ordinance #
1629
Ordinance Title
An Ordinance Amending Title 10, Zoning of the Roseville City Code to Update and Amend Shoreland Mgmt and Environmental Regulations
City Code Chapter Amendment
10
Ordinance Summary
An Ordinance Amending Title 10, Zoning of the Roseville City Code to Update and Amend Shoreland Mgmt and Environmental Regulations
Ordinance Date Passed
3/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHARGING LEVELS: standardized indicators of electrical force, or voltage at which an electric <br />vehicle's battery is recharged. The terms 1, 2, and DC are the most common charging levels and include <br />the following specifications: <br />1. Level 1 is considered slow charging with 120v outlets. <br />2. Level 2 is considered medium charging with 240v outlets, charging head and cord hard -wired to <br />the circuit. <br />3. DC is considered fast or rapid charging. Voltage is greater than 240. <br />ELECTRIC VEHICLE: a vehicle that operates, either partially or exclusively, on electrical energy from <br />the electrical grid, or an off -grid source, that is stored on board for motive purposes. "Electric vehicle" <br />includes: <br />1. Battery electric vehicle <br />2. Plug-in hybrid electric vehicle <br />ELECTRIC VEHICLE CHARGING STATION (EVCS): a public or private parking space that is served <br />by battery charging station equipment that has as its primary purpose the transfer of electric energy (by <br />conductive or inductive means) to a battery or other energy storage torage device in an electric vehicle. <br />ELECTRIC VEHICLE CHARGING INFRASTRUCTURE: conduit/wiring structures machinea, and <br />equipment necessary and integral to support an electric vehicle, includingbattery charging stations and <br />rapid charging stations. <br />ELECTRIC VEHICLE PARKING SPACE: any marked parking space that identifies the use to be <br />exclusively for the parking of an electric vehicle. <br />ELECTRIC VEHICLE SUPPLY EQUIPMENT (EVSE): M equipment or electrical component used in <br />charging electric vehicles at a specific location. EVSE does not include equipment located on the electric <br />vehicles themselves. <br />ELECTRICAL CAPACITY shall mean, at minimum: <br />1. Panel capacity to accommodate a dedicated branch circuit and service capacity to install a <br />208/240V outlet per charger; <br />2. Conduit from an electric panel to future EVCS location(s). <br />LOT WIDTH: The horizontal distanee between the side lines ef a lot measufed at r-igM angles to its depth <br />The <br />minimum distance between: <br />1. Side lot lines measured at the midpoint of the building line; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.