Laserfiche WebLink
April 21, 2023 <br />Page 2 <br />Inspection. Subdivision 4(b) requires inspection and certification of the micro units, <br />“including their anchoring” by a professional engineer. Prince of Peace will have the <br />micro units inspected within a reasonable time after the micro units are anchored, but <br />will not be able to meet that condition by June 2, 2023 if installation of the pin <br />foundations is delayed. <br />This letter is not a change in Prince of Peace’s commitment to meet the standards described <br />in our April 17 letter, especially related to life safety concerns, but we want to be open and <br />realistic about the practical implications of complying the literal terms of the bill. <br />Very truly yours, <br />Stinson LLP <br />Eric Galatz <br />DB02/0762186.0037/10192766.1 <br /> <br />