Laserfiche WebLink
Pavement Management <br />Current Pathway Ratings <br />Pathway Ratings <br />• Scale of 0-100 (100 is new) <br />• Rate every 4 year <br />• $10,000 to do the entire <br />system at once <br />•\ 40-60 _ __ <br />60-80 r ___'�.�?•'-• o rzo 1111 moo a000 1 <br />�tL� ®feet rWti <br />"'"°" —80.100 <br />