My WebLink
|
Help
|
About
|
Sign Out
Home
2023_0425_PWETCPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2023
>
2023_0425_PWETCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 9:04:51 AM
Creation date
4/27/2023 9:00:28 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/25/2023
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CM9 - Ridesharing: Develop a new challenge campaign, create a new <br />12.4 <br />Per project <br />park -and -ride lot, start a new rideboard, and/or incorporate payment for <br />ride -shares and local transit. <br />CM10 -Telecommuter Forward: Be certified as a Telecommuter <br />12.5 <br />Per certification <br />Forward! Community. <br />CM11- Municipal renewable energy purchasing: Purchase 100%clean <br />15.2 <br />Per year <br />energy used by city government via the municipal utility, green tags, <br />community solar garden, or 3rd party agreements. <br />CM12 - Community renewable energy projects: Newly install or support <br />26.4, 26.5 <br />Per project <br />the installation for community -owned or public sector/municipally- <br />owned renewable energy technology —solar, wind, hydro, etc. <br />Climate Planning <br />.. Leaf Action <br />Associated <br />GreenStep <br />Annual <br />Recertification <br />CP1- Safe shelter: Designate a new safe shelter with a plan that <br />Best Practices <br />29.1 <br />Criteria* <br />Per shelter & <br />arranges for adequate provisions and backup power sufficient to meet <br />plan <br />daily run-time requirements as a shelter for one week or longer during <br />utility grid failure. <br />CP2 - Community resilience hub: Create a plan for a new resilience hub <br />29.3 <br />Per plan <br />that describes community services to be provided throughout the year, <br />as well as specific services provided during disruption and into recovery <br />after natural hazard events. <br />CP3 - FEMA rating: Enroll in the FEMA Community Rating System and be <br />19.8 <br />Per certification <br />recognized at a class rating of 6 through 1. <br />/recertification <br />CP4- Climate/resilience plans: Adopt a new or newly updated climate <br />29.2 <br />Per plan/ <br />adaptation/resilience plan that is used for the city's comprehensive <br />update <br />planning, policy -making, and budgeting. Document how underserved <br />communities were part of the planning effort. <br />CPS - Climate risk assessment: Conduct a new climate risk assessment <br />29.7 <br />Per assessment/ <br />or resilience project planning for local infrastructure (i.e. sewer, <br />resilience <br />stormwater, city roads/bridges, water supply, wastewater, municipal <br />project plan <br />powerlines, public facilities, etc.). <br />Gold Leaf Program Proposal I www.MNGreenStep.org 15 <br />Page 67 of 185 <br />
The URL can be used to link to this page
Your browser does not support the video tag.