Laserfiche WebLink
2021 -Victoria Street Trail Study <br />Victoria Street Pathway Update <br />•Study Completed in August 2022 <br />•Two Concepts Developed: <br />•10-foot bituminous on east or west side of the road <br />•Curb and gutter installed along side of road with trail and <br />drainage improvement required. <br />•No formal recommendation for either side <br />•Analysis suggests west side is more favorable <br />•Determined during future design phase <br />•Design concepts fit in narrowest right-of-way corridor (60-feet) <br />Council Action <br />•Roseville passed resolution of support for federal funding on <br />March 20, 2023 <br />•Shoreview passed resolution of support for federal funding on <br />June 5, 2023