Laserfiche WebLink
<br />Victoria Street Roadway & Trail Conceptual Design Study | Study Report - DRAFT | PAGE 1 <br /> <br />Executive Summary <br />The Victoria Street Roadway & Trail Conceptual Design Study (Study) was initiated by Ramsey County in <br />the fall of 2021 to analyze several options for a trail or bikeway along the Victoria Street [County State Aid <br />Highway (CSAH) 52] corridor in Ramsey County, between County Road C in Roseville (south end of <br />corridor) and Harriet Avenue in Shoreview (north end of corridor). The Study included an existing <br />conditions analysis, public and stakeholder engagement, analysis of preliminary cross section concepts, <br />development of two full roadway and trail concept layouts, technical evaluation of the two concepts and <br />planning-level cost estimates. Community and stakeholder engagement included three rounds of open <br />houses, three online surveys, online interactive comment maps and four meetings with the project’s <br />technical advisory committee. The Study was completed in the summer of 2022 and is the first step <br />towards construction of a future Victoria Street project as shown in the graphic below. <br /> Two full concepts were developed and evaluated, one with a 10-foot bituminous multiuse trail on the east <br />side of Victoria Street and one with a trail on the west side (see below). A concrete curb and gutter would <br />be constructed between the roadway and trail. The width of the shoulder adjacent to the trail would also <br />be reduced, and motor vehicle travel lanes would be restriped to reduce widths from 12 feet to 11 feet. <br />These improvements would be considered Phase 1. A future Phase 2 could include full reconstruction of <br />Victoria Street, which would include the need for re-evaluation of a sidewalk or trail on the opposite side <br />of the road. <br /> <br />The Study did not formally identify a preferred roadway and trail design concept, but results of the <br />technical analysis suggest that a trail on the west side of Victoria Street is more favorable than a trail on <br />the east side. A trail on the west side would best address the project needs and would likely result in <br />fewer potential impacts across several social, economic and environmental resources that were reviewed. <br />A formally recommended roadway and trail design will be determined in a future design phase. At the <br />time this report was developed, no funding for the future trail or roadway design has been identified and <br />there is no defined schedule for future construction. Planning level cost estimates for both concepts are <br />approximately $3.0 M.